The Department of Budget and Management has approved the release of P3.8 billion to the Department of Public Works and Highways (DPWH) to fund nationwide tourism road projects and infrastructure initiatives in the Autonomous Region of Muslim Mindanao (ARMM), and to fulfill the department’s contractu
The Redondo Beach replenishment project is expected to be done by the second week of October. “A 36,000 cubic yards of the expected 75,000 cubic yards of sand has been dredged from the channel in Marina del Rey and placed on the beach, and 73,000 cubic yards of 85,000 cubic yards of the near shore [
On September 18, the Port of Skagit has celebrated the start of the Swinomish Channel dredging project. American Construction Co. of Tacoma has won this $1.88 million contract from the Army Corps of Engineers. The dredging project will continue for approximately five months, and the channel will not
According to the ABC News, plans for the repair and upgrade needed to Taylor’s Landing boat ramp at Port Augusta are in the final stages. “A 350 cubic metres of material needs to be dredged from the harbour sea floor,” said Brenton Daw, the Port Augusta City Council senior technical officer. He stat
Gippsland Ports recently announced the successful completion of the Government funded 2011-2012 maintenance dredging program on the bar and inner channels at Lakes Entrance. Gippsland Ports CEO Nick Murray said the recent maintenance dredging program was delivered using the Trailing Suction Hopper D
The U.S. Army Corps of Engineers, New Orleans District and the City of Carencro, La. have signed a Project Partnership Agreement for the design and construction of flood risk management features within and near the Lafayette Parish city. “The City of Carencro and the surrounding area has experienced
Maarten Smits (51) will take up his position as the new managing director of Deltares, the research institute for water, subsurface and infrastructure, with effect from 1 December 2012. He will succeed Harry Baayen, who will be retiring effective the same date. The new managing director describes De
Community action group, Save Our Keppel Island Taskforce (SOKIT), hold grave concerns for local marine life if GKI Resort Pty Ltd proposed Revitalisation Plan goes ahead. GKI Resort’s environmental impact statement (EIS) identifies large volumes of acidic soil in the area of the proposed marina with
The U.S. Environmental Protection Agency announced that a $10 million cleanup of contaminated soil will begin in mid- to late September at the Solvent Savers Superfund site, a chemical waste recovery facility, in Lincklaen in Chenango County, New York. Soil and ground water on the site were contamin
The U.S. Army Corps of Engineers Galveston District awarded a contract to Manson Construction Co., in the amount of $8,758,350, for maintenance dredging of the Sabine-Neches Waterway, Port Arthur Canal, turning basin, junction area and Taylors Bayou in Jefferson and Orange counties, Texas, and Camer
After securing and successfully completing two major cable projects in the Irish Sea, and a further fault investigation on an Interconnector underway, the joint venture of Osiris Marine Services and Nordic Offshore Marine look to the spot charter market to provide a cost effective solution to subsea
Parliament has approved a credit facility agreement for an amount of €197 million to finance the design, civil and dredging works at the Takoradi port. The agreement which is between the Ghana Ports and Harbors Authority (GPHA) with the government of Ghana as guarantor and the KBC bank NV, Belfius B
The Meteorology, Climatology, and Geophysical Agency (BMKG) has announced that rainy season would hit Jakarta this October. Head of Water Resources Maintenance for East Jakarta Water Management Public Works Sub-Department, Sunarto, stated that his department supports the effort to prevent flood by n
The bridge over the Sheboygan River will be closed to traffic during the next week because of the dredging project. From 7:00 pm to 7:00 AM, September 25-27, 2012, the Eight Street Bridge will be closed. During these periods, Ryba Terra Joint Venture will be dredging approximately 1,400 yards of sed