
The registration period for Offshore Energy Exhibition & Conference 2024 (OEEC 2024) in Amsterdam is now open. Early-bird tickets are available on the OEEC website with a 25% discount using the code EARLYBIRD2024. Hurry up as the code is valid only until July 15! For students who want to meet profes

Premier Marinas Limited has announced that the 2024 dredging campaign is now underway at Brighton Marina. The dredging program will be carried out between the external dredging contractor, ML Dredging and Premier Marinas’ own dredger ‘Doris’. Brighton Marina is licensed by the MMO to remove 77,000 c

Museu de Portimão said that more than 2,200 pieces from the prehistoric period to the present were collected from the dredged deposits of the Arade River and Alvor’s Ria, in Portimão. “These are metallic objects that cover all types, from those for daily use, rituals, to instruments related to profe

The York County new dredge has arrived in Wells, Maine, where it will be moored and utilized by the Town and communities throughout the County. The County decided to purchase the dredge back in December 2022. It has been housed at Saco Public Works Department for over a year. Wells and York County c

The HKIE GD-PolyU Delegation visited Yangshan Deepwater Port and CCCC Dredging (Group) Co Ltd in Shanghai this weekend. Yangshan Deepwater Port is the world’s largest automated container port with an annual throughput of over 20 millions TEU. Reclamation started in 2002 and has been undergoing sever

The City of Gold Coast has appointed a contractor to operate and maintain the Surfers Paradise Sand Backpass from 2024 to 2027. Setup works are underway from May. The 2024 sand pumping campaign is expected to run from mid-June until early September. The Surfers Paradise Sand Backpass System is a san

Jan De Nul Group said that heir turnover continued to grow to 2.9 billion euro in 2023, a record in the history of the Group. This led to an increase in EBITDA with 39% to 610 million euro or 21% on turnover, globally resulting in a strong profit of 296 million euro. “These growth figures were achie

Construction of the Clark and Delaware/Horseshoe Islands Restoration Project is underway, Toledo-Lucas County Port Authority said. Mark Haynes Construction, the construction contractor on this project, is currently building the perimeter rock berm/revetment structures at Clark and Delaware/Horseshoe

In 1954, Ellicott Dredges’ vessel known as the Río Magdalena was shipped to Colombia to operate in various river dredging projects including the Canal del Dique, the Magdalena River, and the Sinu River. The massive cutter suction dredge (CSD) is 230ft (70.5m) in length and 44ft (13.5m) in width. The

Last week, the Minister for Agriculture, Food and the Marine, Charlie McConalogue together with Leas Chathaoirleach of Donegal County Council, Cllr Gerry McMonagle, officially opened the Greencastle Harbor Breakwater. Officially opening the Breakwater, the Minister said: “Greencastle is an important

Royal IHC recently introduced a high-level control system Mission Master – making a major step towards increased autonomy and operational efficiency for trailing suction hopper dredgers. Mission Master provides a semi-autonomous workflow that integrates seamlessly with existing automation systems. C

The State of Delaware will join the private operator of the Port of Wilmington, Enstructure, to build a new port terminal at a site in Edgemoor, Delaware. This historic $635 million infrastructure project is set to be largest shipping terminal in Delaware since the current Port of Wilmington opened

The Department of Transport (DoT) WA has commenced maintenance dredging works at the Exmouth Boat Harbour (EBH). Occasional maintenance dredging is required in the basin and entrance channel of the EBH to maintain navigable depths for commercial and recreational users of the harbour. This campaign w

Maldives Fund Management Corporation (MFMC) signed an agreement with Atoll Works Private Limited yesterday, marking a significant step towards the dredging, reclamation, and shore protection of 16 islands within K. Gaafaru lagoon. The project includes the reclamation of an additional 40 hectares of