Work on the Port of Siuslaw’s turning basin has come to a halt after an accident with the tug and barge earlier this month. On the evening of July 6, a tug was towing the loaded barge to a disposal site outside the Siuslaw River bar when the barge hit a submerged object that tore […]
Residents have expressed their concerns over the sand excavation in Sungai Rajah near Kampung Lee Kim Sai, Rawang, and say it has to be monitored. Rawang assemblyman Gan Pei Nei said she had received reports and had sent it to the relevant agencies for further action. She hoped Kumpulan Semesta Sdn
The Entrance Dredger Working
Sand Dredger on the Mississippi in Minnesota Event: Boating What: Sand Dredger Where: Mississippi River, Wabasha, MN, USA
JF Hose have opened a large bore hose division at its Leyland factory specialising in production of hand-built rubber hoses for dredging, dockside oil and heavy industrial applications in sizes 2″ to 40″ diameter and lengths up to 12 metres. The factory has on-site rubber compounding, calendering an
To stay competitive, the Port is planning more than $3 billion in upgrades, including a new container terminal, improvements for an existing terminal, redevelopment and consolidation of two older terminals, the replacement of an obsolete bridge and upgraded rail infrastructure. Topping the Port’s de
The process of widening and deepening the Bukit Timah Canal may be completed within two years. Mr Chris de Souza, an MP for Holland-Bukit Timah GRC, told The Straits Times that this is the tentative timeline after viewing the plans yesterday with officials from PUB, the national water agency. It was
The cleanup of wetland vegetation covered by dredge material after a spill four years ago should be completed by early next year, … By Shakaya Andres (jacksonville) [mappress] Source: jacksonville, July 21, 2010;
Congresswoman Louise Slaughter and Congressman Bill Owens announced Tuesday that $5 million in funding for harbors in Monroe and … (13wham) [mappress] Source: 13wham, July 21, 2010;
Lt. Col. Michael C. Derosier assumes command of the U.S. Army Corps of Engineers, Detroit District, at a local ceremony this week. This time-honored traditional Change of Command ceremony will be held at the Grosse Pointe War Memorial in Grosse Point Farms at 11 a.m., Friday, July 23. As District En
An environmental program to dredge up the Pasig River is nearing completion before the end of the year… (abs-cbnnews) [mappress] Source: abs-cbnnews, July 21, 2010;
A large ring of yellow buoys floats on the surface of Pegan Cove, marking the area where contractors have started removing sediment … By Charlie Breitrose (metrowestdailynews) [mappress] Source: metrowestdailynews, July 21, 2010;
Bradys Run Lake closed Monday as workers prepared to drain and dredge the 28-acre lake in the county-owned Bradys Run Park in Brighton … (timesonline) [mappress] Source: timesonline, July 21, 2010;
If there is surplus sand from a planned beach replenishment project this fall, it will likely be stockpiled until it can be allocated … By Victor Tine (gloucestertimes) [mappress] Source: gloucestertimes, July 21, 2010;