
A new section of the River Parrett is to be dredged in the following days, Somerset Rivers Authority reports. Large quantities of silt will be removed from 1.37miles (2.2km) of the river between the village of Moorland and the M5, to increase its capacity to carry flood water. Dredging is due to sta

Great Lakes Dredge & Dock Corporation (GLDD) announced today the receipt of several major dredging contracts totaling $60.9 million which will be included in the year-end 2020 backlog number. The awarded work includes: North County Comprehensive Shore Protection Project (Coastal Protection, Florida,

Hopper dredger Sospan Dau was busy over the past two weeks discharging 18,000m3 of dredged material onto the foreshore in Southsea. According to the officials, the dredger has formed a working platform with this material in preparation for sheet piling on the west side. This will allow the contracto

Development work of Ha. Ihavandhoo Harbor is well underway, with overall 35% project progress to date, Maldives Transport and Contracting Company (MTCC) reports. New harbor basin dredging works for the project is currently ongoing, with 59% completion. Scope of works for the project include: dredgin

The U.S. Army Corps of Engineers, Los Angeles District, said in their latest announcement that the dredging operations are well underway at the Port of Hueneme main channel. According to USACE, a projected completion date is March 27. Curtin Maritime Corp., the contractor for the project, will be de

Royal Boskalis Westminster (Boskalis) will be one of the sponsors of the 4the edition of the International Congress “Hydraulic Structures and Dredging”, which will be held in Moscow, next year. According to the organizers, the company made the decision based on the high importance of Russian dredgin

North Queensland Bulk Ports Corporation (NQBP) has announced Wisely Services Pty Ltd as the principal contractor for its Bowen Wharf Repair Project. Conducted as part of NQBP’s maintenance and repairs program, the project includes the repair or replacement of some of the Wharf’s timber members. NQBP

WEDA’s next webinar, named Houston Ship Channel Widening and Deepening Update, will take place on Thursday, January 14, 2021, from noon to 1 PM EST. This webinar will be presented by: Charlie Jenkins, Sr. Director, Port of Houston Authority; Captain J.J. Plunkett, Retired. U.S. Coast Guard; Dana Ch

The U.S. EPA is observing the significant and rapid progress addressing polychlorinated biphenyl (PCB) contamination in New Bedford Harbor during the past several years. EPA’s cleanup work in the harbor has achieved major milestones, resulting in EPA now transferring control of a 5-acre industrial p

Lt. Gen. Scott Spellmon, the 55th Chief of Engineers and Commanding General of the U.S. Army Corps of Engineers, is visiting the Memphis District today to get a first-hand look at some ways the District is supporting the USACE Civil Works mission and the Mississippi River and Tributaries Project. Me

Encore Dredging Partners (EDP), a newly formed premier specialty dredging and marine infrastructure services firm, has acquired Inland Dredging Company for an undisclosed purchase price. EDP completed the transaction with the support of AV Capital who is the sole financial sponsor of EDP and will co

St. Johns Ship Building, Inc. (SJSB) has completed construction of the first Water Injection Dredger for IHC America. Last year, IHC won a contract to design a water injection dredger (WID) for the North Carolina State Ports Authority (NCSPA). In line with NCSPA’s specifications, the dredger is desi

Somerset Rivers Authority has just announced that a new round of dredging of the River Parrett is due to start on Thursday 14 January, between Moorland and the M5. The officials are planning to remove about 22,000 cubic metres of silt in order to increase the Parrett’s capacity to carry flood water.

The U.S. Army Corps of Engineers Los Angeles District, in coordination with County Ventura, is set to resume maintenance dredging near the entrance of the Channel Islands Harbor. The dredge operations were shut down for the holiday break from Dec. 23 to Jan. 4; however, during that time, a portable