DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Beach Nourishment

Loading filters...
Coastal ErosionCoastal ProtectionDredging
Cape to Cape resilience project – Inverloch on-ground works
Beach Nourishment

Cape to Cape resilience project – Inverloch on-ground works

DEECA – Department of Energy, Environment and Climate Action (Victoria) has published their latest update about the Cape to Cape Resilience Project. The Cape to Cape Resilience Plan has identified dune reconstruction and beach nourishment as the first action in the adaptation pathway to maintain the

about 1 year ago
Norfolk Dredging wins Carolina Beach and Kure Beach CSRM contract
Beach Nourishment

Norfolk Dredging wins Carolina Beach and Kure Beach CSRM contract

The U.S. Army Corps of Engineers, Wilmington District has awarded a $23.5 million contract to Norfolk Dredging for dredging and beach nourishment works in North Carolina. Overall, the Carolina Beach and Kure Beach work will include dredging, transporting, placing, planting and shaping beach fill and

about 1 year ago
Mid West Ports to commence sand bypass campaign in Geraldton
Beach Nourishment

Mid West Ports to commence sand bypass campaign in Geraldton

Mid West Ports Authority today issued an important notice regarding the Northern Beaches Stabilization Program. In the notice, the authority said that the start of Sand Bypass Campaign in Geraldton, with sand stockpiling at Pages Beach is set for tomorrow, Friday, 9 May. “Main works and trucking wil

about 1 year ago
Jamaica Beach nourishment project to start this week
Beach Nourishment

Jamaica Beach nourishment project to start this week

The City of Jamaica Beach, Texas, has just announced that the Coastal Erosion Planning & Response Act (CEPRA), also known as the Beach Nourishment Project, has been postponed due to inclement weather. Originally scheduled for Tuesday, May 6, 2025, the Jamaica Beach Nourishment Project will now kick

about 1 year ago
Volusia County dredging/beachfill project kicks off
Beach Nourishment

Volusia County dredging/beachfill project kicks off

The U.S. Army Corps of Engineers, Jacksonville District recently kicked off maintenance dredging of the federal navigation channels and intracoastal waterways in Volusia County. Since mid-April, USACE crews are actively dredging the shoaling within the Intracoastal Waterway (IWW) and Ponce de Leon I

about 1 year ago
Work on second periodic renourishment of Fernandina Beach starts soon
Beach Nourishment

Work on second periodic renourishment of Fernandina Beach starts soon

The U.S. Army Corps of Engineers, Jacksonville District, is set to begin work on the second periodic renourishment of Fernandina Beach a week from today, with initial construction is projected to start on 2nd St, next Monday, May 12th. Construction will likely occur 24/7 until complete, which may in

about 1 year ago
Dredger Strandway pumping beach material near the Hovertravel terminal
Beach Nourishment

Dredger Strandway pumping beach material near the Hovertravel terminal

As part of the coastal defence works on Frontage 3 (Southsea Common), crews have started importing beach material. The Trailing Suction Hopper Dredger Strandway arrived on May 1st and will work in the vicinity of Hovertravel terminal for around eight days. This type of dredger is most commonly used

about 1 year ago
Harvey Cedars beachfill work underway
Beach Nourishment

Harvey Cedars beachfill work underway

Great Lakes Dredge & Dock Company (GLDD) is currently conducting dredging and beachfill operations in Harvey Cedars, N.J. According to USACE, this work is designed to maintain the dune and berm system, which serves to reduce the risk of coastal storm damages. The sand is being pumped onto the beach

about 1 year ago
Canaveral Sand Bypass project extended to May 15
Beach Nourishment

Canaveral Sand Bypass project extended to May 15

Following a two-week permit extension authorized by the Florida Department of Environmental Protection (FDEP) after coordination with the Florida Fish & Wildlife Commission (FWC) and the U.S. Fish & Wildlife Service (USFWS), the ongoing multi-million-dollar Canaveral Sand Bypass/beach renourishment

about 1 year ago
Hard slog to restore Gold Coast beaches continues
Beach Nourishment

Hard slog to restore Gold Coast beaches continues

Beach restoration and protection works are continuing in Surfers Paradise with installing geoboxes into the dunes near View Avenue, the City of Gold Coast said. Work has begun to install the large sand-filled textile boxes which will help shield the foreshore from future high tide and damaging swell

about 1 year ago
Dredging and beach nourishment at the Golden Beach
Beach Nourishment

Dredging and beach nourishment at the Golden Beach

Sunshine Coast Council is about to begin dredging and beach nourishment works at the Golden Beach. According to Cr Terry Landsberg, nourishment works are set to begin tomorrow, Wednesday, 30th April, and will continue until mid-June at the following locations: “Please note, there may be some disrupt

about 1 year ago
Sebastian Inlet beach restoration project in full swing
Beach Nourishment

Sebastian Inlet beach restoration project in full swing

With approximately 92,000 cubic yards of sand placed by truck on the beaches south of Sebastian Inlet, ATL Diversified is now pumping sand from the Sebastian Inlet channel to the remainder of the project areas. ATL placed approximately 92,000 cubic yards of material on part of a 2.5-mile stretch of

about 1 year ago
Beach replenishment continues in the Isle of Palms
Beach Nourishment

Beach replenishment continues in the Isle of Palms

Construction crews are making great progress on the Isle of Palms, SC, beach re-nourishment project. According to the City, the project is now halfway complete with sand placement being completed from 6th Avenue through 9th Avenue. Sand has also been placed between 4th and 6th Avenues, but grading i

about 1 year ago
Rudee Inlet dredging project on display
Beach Nourishment

Rudee Inlet dredging project on display

The City of Virginia Beach, VA, has requested authorization to perform maintenance dredging works within the Rudee Inlet. The proposed project includes maintenance dredging, by hydraulic methods, of Rudee Inlet navigation channel frameworks, Federal Channel, Outer Deposition Basin and Lake Wesley Ch

about 1 year ago
  • 1
  • …
  • 16
  • 17
  • 18
  • …
  • 41