DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Coastal Protection

Loading filters...
DredgingInfrastructureBeach NourishmentTechnologyBreakwater RepairPorts & LogisticsCoastal Erosion
Historic Jeddah Waterfront Project enters second phase, dredging included
Coastal Protection

Historic Jeddah Waterfront Project enters second phase, dredging included

Saudi Arabia’s Historic Jeddah Waterfront Rehabilitation Project has entered its second phase, with construction underway on a 972-metre marine quay. This work is part of wider efforts to restore Al Arbaeen Lagoon and revitalize the city’s historic waterfront. The project, implemented under the Hist

about 4 months ago
BREAKING NEWS: Van Oord kicks off Lincolnshire beach nourishment
Coastal Protection

BREAKING NEWS: Van Oord kicks off Lincolnshire beach nourishment

Van Oord has started the beach nourishment works to help reduce flood risk for Lincolnshire’s coastal communities, on behalf of the Environment Agency. According to Van Oord, over the next 4 to 5 weeks, around 300,000 cubic meters of sand will be pumped onto the beaches using the Vox Alexia – one of

about 4 months ago
Work underway to protect Northumberland shoreline
Coastal Protection

Work underway to protect Northumberland shoreline

Northumberland County Council said that two projects are underway – designed to protect two of the county’s villages from coastal erosion. In the south-east, work on the Cresswell Coastal Road Slope Management Scheme has started and is expected to last around eight weeks. It will involve stabilizin

about 4 months ago
Annual beach work starts at Lincolnshire coast
Coastal Protection

Annual beach work starts at Lincolnshire coast

The Environment Agency will be starting annual work tomorrow to reduce the risk of flooding for Lincolnshire’s coastal communities. Sand will be topped up on beaches between Saltfleet and Gibraltar Point costing over £7 million. This annual beach management work involves dredging sand from licensed

about 4 months ago
Boskalis awards framework agreement for beach management in England
Coastal Protection

Boskalis awards framework agreement for beach management in England

Boskalis Westminster Ltd., as part of the VBA joint venture with VolkerStevin and AtkinsRéalis, has been awarded a framework agreement for beach management across England. Under this contract with the Environment Agency, the JV will focus on beach management, coastal protection and flood-risk reduct

about 4 months ago
Van Oord secures place on EA’s Beach Management Framework
Coastal Protection

Van Oord secures place on EA’s Beach Management Framework

Van Oord has secured one of two places on the Environment Agency’s specialist marine Beach Management Framework, through which coastal protection and beach maintenance works will be delivered around the English coastline. Van Oord, with support from subsidiary Mackley, will provide the Environment A

about 4 months ago
Spotlight on Mid-Breton Land Bridge marsh creation project (VIDEO)
Coastal Protection

Spotlight on Mid-Breton Land Bridge marsh creation project (VIDEO)

Louisiana Coastal Protection and Restoration Authority (CPRA) has completed the Mid-Breton Land Bridge Marsh Creation Project. This project restored 373 acres of vital wetland habitat in an area devastated by Hurricane Katrina. According to CPRA, this $40 million investment is part of a larger land

about 4 months ago
NMDC Dredging and Marine inaugurates Coastal and Hydrodynamic Center
Coastal Protection

NMDC Dredging and Marine inaugurates Coastal and Hydrodynamic Center

Abu Dhabi’s based NMDC Dredging and Marine has inaugurated the NMDC Coastal and Hydrodynamic Center, the region’s first hydraulic physical modelling test facility. According to NMDC, the purpose-built facility enables the simulation and physical testing of complex marine, coastal and offshore infras

about 5 months ago
PHOTO OF THE DAY: Protecting Louisiana’s working coast
Coastal Protection

PHOTO OF THE DAY: Protecting Louisiana’s working coast

The Fourchon Beach Restoration and Protection project is underway in Lafourche Parish, restoring approximately 6,000 linear feet of eroded shoreline, with support from $2 million in funding from the Louisiana Coastal Protection and Restoration Authority (CPRA). This stretch of beach plays a vital ro

about 5 months ago
Dike-raising project at Masonville Dredged Material Containment Facility enters final stage
Coastal Protection

Dike-raising project at Masonville Dredged Material Containment Facility enters final stage

The final phase of a major dike-raising project is underway at the Masonville Dredged Material Containment Facility in Baltimore, Maryland, USA. Once completed, the dike will be raised to +42 feet above the Patapsco River and will provide the Maryland Port Administration (MPA) with 10 million cubic

about 5 months ago
Work starts on Anchorsholme Coast Protection Scheme
Coastal Protection

Work starts on Anchorsholme Coast Protection Scheme

Work has started on the Anchorsholme Coast Protection Scheme, Blackpool Council said. The project is set to protect 5,000 properties from flooding and help save the sandy beach from coastal erosion. Works to establish the construction compound are nearing completion, and works to the sloped revetmen

about 5 months ago
NMDC Dredging and Marine unveils Coastal and Hydrodynamic Center (VIDEO)
Coastal Protection

NMDC Dredging and Marine unveils Coastal and Hydrodynamic Center (VIDEO)

NMDC Dredging & Marine has unveiled the NMDC Coastal & Hydrodynamic Center, the region’s first hydraulic physical modeling test facility, bringing advanced coastal and marine engineering validation to the UAE. This milestone strengthens local expertise, enabling more efficient marine operations, NMD

about 5 months ago
BREAKING NEWS: Boskalis raises the bar in Portsmouth
Coastal Protection

BREAKING NEWS: Boskalis raises the bar in Portsmouth

Over the past six years, Boskalis Westminster Ltd., in a joint venture with VolkerStevin, has been working on the largest coastal protection project ever undertaken in the United Kingdom – the Southsea Coastal Scheme in Portsmouth. “The result: a well-protected city with an award-winning promenade a

about 5 months ago
Phase 2 of 40 Arpent Canal Wetlands Enhancement underway
Coastal Protection

Phase 2 of 40 Arpent Canal Wetlands Enhancement underway

Construction is now underway on Phase 2 of the 40 Arpent Canal Wetlands Enhancement. This is a major step towards restoring this once thriving marsh, Louisiana Coastal Protection and Restoration Authority (CPRA) said. “This project is spearheaded by our partners Ducks Unlimited, who secured funding

about 5 months ago
  • 1
  • …
  • 12
  • 13
  • 14
  • …
  • 44