
HERBOSCH-KIERE said that the preparatory works for the stabilization of the riverbank along the Scheldt River is underway, using soil mixing walls. Stabilizing the riverbank along the Scheldt River involves a transition toward nature-based bioengineering. By moving away from purely hardened concrete

For the past six years, calculations, drawings and plans have been prepared to reinforce the 30-kilometer-long dike between the city of Zwolle and the town of Olst in the Netherlands, Boskalis said. Starting this year, the Boskalis Nederland project teams also began the physical work, with the offic