IHC Merwede has been awarded the contract for the design, construction and delivery of a 23,684kW self-propelled cutter suction dredger (CSD) from Royal Boskalis Westminster (Boskalis). The innovative new dredging vessel will be one of the largest CSDs of its kind in the world. As part of the close
CCCC Second Harbor Engineering Co., Ltd. has recently signed the contract for survey and design of the 50,000t oil terminal of Chaozhou Port with Yihua Petrochemical Co., Ltd. Located at Chaozhou Port, the project is designed to store and transfer refined oil products like gasoline, diesel and aviat
A delegation from the United Kingdom Hydrographic Office (UKHO) has visited Abu Dhabi Ports Company and met with ADPC’s Chief Harbour Master, the Marine Information Officer and the Aids to Navigation Manager to discuss mapping and charting the Abu Dhabi coast. It was the UKHO’s delegations second vi
The 2014 Maritime Economic Development Workshop is scheduled for February 20 – 21, 2014, San Diego, CA. The theme of the 2014 Maritime Economic Development Workshop is Tackling Port Economic Development Challenges and Measuring Effectiveness. Port authorities and their private-sector partners invest
The Van Oord-GMB joint venture has been awarded a contract by the Hollandse Delta Water Board to reinforce the dikes on Dordrecht Island. The total contract value amounts to more than EUR 21 million. The work will commence in mid-2014 and will continue until the end of 2016. This joint venture will
Water managers can now make a more accurate assessment of whether they are complying with the standard for heavy metals in surface water with the new computer model developed by Deltares: PNEC.pro. This model takes the local water chemistry into account, making it possible to calculate local standar
State Senator Bob Duff (D-Norwalk) issued the following statement on the completion of the multi-phased Norwalk Harbor dredging process: “For over ten years now the recreational boaters, fishermen and commercial shippers of Norwalk’s maritime community have been calling for improvements to our city’
The high level of activity at Lerwick Harbour has been enabled by the port’s latest deep-water quay being brought into use immediately on completion this week as part of an ongoing expansion of facilities. The 100-metre Berth 7 at Greenhead Base provides an extension to a new 100-metre-plus quay add
Private equity firm NPM Capital is taking a majority interest in Dieseko Group BV, manufacturer of hydraulic vibratory foundation equipment. These machines and power packs are supplied for rental and sales to foundation companies across the globe. Not only on land and on the water but also in the of
VULKAN Couplings’ focus at the product and service presentation at MARINTEC 2013 in Shanghai will be on specially integrated drive solutions for suction dredgers and offshore ships. The couplings manufacturer, which has its head office in Herne, Germany, has been supplying drive components for many
A&P Tees have proven once again that the importance of Health and Safety is at the forefront of all projects. Cemex Marine have visited the yard with the Sand Harrier, Sand Fulmer, Sand Heron and Sand Falcon covering 40,000 man hours of work. This has all been carried out INCIDENT FREE. Workscope on
APM Terminals has been named the winner of the 2013 Lloyd’s List Asia Awards annual “Port Operator” Award in recognition of maintaining “the highest standards of operational efficiency and customer service throughout the year” among port and terminal operators in the Far East. Excluding operations i
On the 28th of October 2013, the ‘golden month’, the new Small Vessel Factory was opened at Damen Shipyards Changde, China. The Production Hall for workboats up to 26 metres, was opened by the yard’s Managing Director, Mr. Liu Xiangping. The date was especially chosen, as it was exactly 19 years ago
The Washington Department of Ecology has issued penalties of $20,000 each to a Cashmere developer and the contractor he hired for excavation work in Mission Creek in September 2012, in violation of state shoreline and water quality regulations. George N. Valison and construction contractor David G.