DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Operations & Maintenance

PHOTO: Trinity-East Island work coming along nicely
Operations & Maintenance

PHOTO: Trinity-East Island work coming along nicely

Louisiana Coastal Protection and Restoration Authority (CPRA) today released a photo update of the Terrebonne Basin barrier shoreline system project. In the update, CPRA said that over 2 million cubic yards of sand are being used to raise the Trinity-East Island above sea level and restore beach, du

about 5 years ago
Lincolnshire beach scheme begins next month
Operations & Maintenance

Lincolnshire beach scheme begins next month

Work to reduce the risk of flooding for Lincolnshire’s coastal communities is set to begin next month (April 2021) with the yearly replenishment of sand on beaches between Saltfleet and Gibraltar Point. The Environment Agency’s annual beach management scheme sees sand dredged from licensed areas of

about 5 years ago
Mat Sinking Unit completes the 2020 season
Operations & Maintenance

Mat Sinking Unit completes the 2020 season

The U.S. Army Corps of Engineers, Vicksburg District’s Mat Sinking Unit completed its 2020 revetment season March 4. The Mat Sinking Unit placed approximately 266,000 squares of articulated concrete squares, also known as revetment, along the Mississippi River before its return to the Vicksburg Harb

about 5 years ago
North Brevard renourishment project kicks off in late March
Operations & Maintenance

North Brevard renourishment project kicks off in late March

North Brevard shore protection renourishment project is set to begin in late March, according to the Army Corps Jacksonville District. Beach re-nourishment of the North Reach section of the Brevard County Shore Protection Project will start on or about March 20, announced the Army Corps. The effort

about 5 years ago
Portsmouth Harbour dredging project starts in late March
Operations & Maintenance

Portsmouth Harbour dredging project starts in late March

Boskalis Westminster Ltd. is about to kick off a Surveying and Maintenance Dredging project in the Portsmouth Harbour. According to the Queen’s Harbour Master Portsmouth, the surveying and maintenance dredging of the Portsmouth Harbour and its approach channels will be conducted from 22 to 30 March

about 5 years ago
Record of decision signed for Mississippi River mainline levees SEIS II
Operations & Maintenance

Record of decision signed for Mississippi River mainline levees SEIS II

The U.S. Army Corps of Engineers (USACE) has signed the Record of Decision for the Mississippi River mainline levees Final Supplemental Environmental Impact Statement II. The Record of Decision details USACE’s decisions on conducting remedial measures necessary to control seepage and/or raise and st

about 5 years ago
Kalaklan River dredging project underway
Operations & Maintenance

Kalaklan River dredging project underway

The Philippines DPWH Regional Office III has started works on a flood prevention project on the Kalaklan River in Olongapo City. This Important flood prevention project started on March 2, 2021, when DPWH deployed one of its cutter suction dredgers at the Kalaklan River to begin the scheduled dredgi

about 5 years ago
PHOTO: Rohde Nielsen dredging in Figueira da Foz
Operations & Maintenance

PHOTO: Rohde Nielsen dredging in Figueira da Foz

Rohde Nielsen A/S has just released this beautiful photo of an ongoing maintenance dredging project in Figueira da Foz, Portugal. Since 2014, Rohde Nielsen A/S has performed several maintenance dredging campaigns in the port, winning three consecutive contracts in a row. Recently, the company was aw

about 5 years ago
Morehead beachfill project enters final phase
Operations & Maintenance

Morehead beachfill project enters final phase

Morehead City Harbor dredging and beach nourishment project continues to progress and remains on schedule for late March completion. According to the latest update, the beachfill is progressing west of the Oceanana Pier and towards “the finish line” at the Circle – the current outfall is near the in

about 5 years ago
Extreme weather calls for more robust canal maintenance
Operations & Maintenance

Extreme weather calls for more robust canal maintenance

The unpredictability of the UK’s weather has highlighted the importance of both reactive and planned canal maintenance works, according to The Rothen Group. With a low of -23°C being recorded in Scotland in February this year, the coldest night since 1995 according to the Met Office, and Storm Chris

about 5 years ago
Post-Florence project moving along nicely
Operations & Maintenance

Post-Florence project moving along nicely

Great Lakes Dredge & Dock and their hopper dredge Liberty Island yesterday delivered the last load of sand to Reach 1 (Far West Emerald Isle) of the post-Florence Renourishment Project. After completing the Reach 1, GLDD moved to the next location and placed the first load of sand in Central Emerald

about 5 years ago
Muddy River FRM project update
Operations & Maintenance

Muddy River FRM project update

The U.S. Army Corps of Engineers, New England District has presented latest update on the Muddy River Flood Risk Management project. According to the Army Corps, dredging activities continue to progress on Phase 2 of the $36.5 million Muddy River project in Boston and Brookline, Massachusetts. “Begi

about 5 years ago
Damaged Mill Creek levees repaired
Operations & Maintenance

Damaged Mill Creek levees repaired

Sections of the Mill Creek Levee System that were damaged during the February 2020 flooding are now repaired thanks to the efforts of the Army Corps’ Walla Walla District and their contractor TDX Power Services. This was a partnership project with the levee sponsor, the Mill Creek Flood Control Zone

about 5 years ago
USACE releases photos of artifacts found during Savannah River dredging
Operations & Maintenance

USACE releases photos of artifacts found during Savannah River dredging

The U.S. Army Corps of Engineers, Savannah District has released photos of artifacts removed from the Savannah River during recent dredging operations. The photos show items inadvertently discovered during normal dredging operations in late February, including cannons dating to pre-Civil War times,

about 5 years ago
  • 1
  • …
  • 50
  • 51
  • 52
  • …
  • 62