DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Technology

Loading filters...
Research & DevelopmentEquipmentInfrastructure
Transporting sand and gravel via River Thames
Technology

Transporting sand and gravel via River Thames

CEMEX UK’s barges are currently transporting sand and gravel from Dagenham to Fulham, via the River Thames, without adding trucks to London’s busy roads. Using a barge offers a 75% CO2 saving compared to road transport, with each loaded barge saving the equivalent of 20 HGV lorries travelling across

about 3 years ago
USACE, Ryba busy in Maumee Bay
Technology

USACE, Ryba busy in Maumee Bay

The U.S. Army Corps of Engineers, Buffalo District, along with Ryba Marine Construction Company is in Toledo, Ohio, in the Maumee Bay, performing maintenance dredging. This work includes deepening of the shipping channel to provide ease of navigation and safe passage to larger vessels that utilize t

about 3 years ago
Berwick dredging deal for Crosby
Technology

Berwick dredging deal for Crosby

Crosby Dredging LLC, from Galliano, Louisiana, has won a $17,901,800 firm-fixed-price contract for a maintenance dredging project in Louisiana. Bids were solicited via the internet with five received. Work will be performed in Berwick, Louisiana, with an estimated completion date of May 31, 2023. Th

about 3 years ago
Spotlight on the largest coastal protection scheme in North-Western Europe
Technology

Spotlight on the largest coastal protection scheme in North-Western Europe

Iarnród Éireann – Irish Rail has awarded Jacobs the commission for detailed design and planning services, including environmental assessments and statutory submissions for the East Coast Railway Infrastructure Protection Projects (ECRIPP) program. ECRIPP is required to defend long sections of the es

about 3 years ago
USACE builds underwater sill to halt saltwater intrusion on Mississippi River
Technology

USACE builds underwater sill to halt saltwater intrusion on Mississippi River

The USACE New Orleans District will construct an underwater sill across the bed of the Mississippi River channel to prevent further upriver progression of salt water from the Gulf of Mexico. “Once the river volume begins to fall in low water season, we regularly monitor the progression of the saltwa

about 3 years ago
J.E. McAmis wins Tillamook South Jetty deal
Technology

J.E. McAmis wins Tillamook South Jetty deal

J.E. McAmis has won a $57.9M contract through the U.S. Army Corps of Engineers Portland District to perform repairs on the Tillamook South Jetty in Oregon. Proposed repairs to the south jetty include rebuilding the jetty head with an approximate 100-foot cap and approximately 1,350 feet of the jetty

about 3 years ago
Mindemoya River dredging program to allow salmon to spawn
Technology

Mindemoya River dredging program to allow salmon to spawn

The salmon were obviously ready to move up the mouth of the Mindemoya River in Providence Bay to stage and spawn, and with the help of Manitoulin Streams Improvement Association (MSIA), the Ministry of Natural Resources (MNR) and the Municipality of Central Manitoulin, this was accomplished last wee

about 3 years ago
Conneaut City Council accepts bid for dredged material facility
Technology

Conneaut City Council accepts bid for dredged material facility

Conneaut City Council has awarded a contract to construct the city’s new dredged material facility to Independence Excavating. Council approved awarding the $11.47 million deal at a meeting earlier this week, reports Star Beacon. The work is expected to take about a year, with the hope that one dred

about 3 years ago
Rosmorport announces tender for dredger Peotr Sablin repair
Technology

Rosmorport announces tender for dredger Peotr Sablin repair

FSUE Rosmorport is seeking a contractor for repairing the non-self-propelled dredger Peotr Sablin, owned by Rosmorport’s Astrakhan Branch. According to the official portal for public procurement, initial (maximum) price of the contract is RUB 14,963,253 ($256,549). According to Rosmorport, the biddi

about 3 years ago
South San Francisco Bay Shoreline Project VIDEO
Technology

South San Francisco Bay Shoreline Project VIDEO

On Wednesday, September 21, members of the USACE San Francisco District’s Survey Team took their eBee Tac drone to photograph the construction of the South San Francisco Bay Shoreline Project Phase 1 in Alviso, Calif. This project is a multi-agency partnership between the U.S. Army Corps of Engineer

about 3 years ago
The Crown Estate, BMAPA release annual Area Involved report
Technology

The Crown Estate, BMAPA release annual Area Involved report

The Crown Estate and The British Marine Aggregate Producers Association (BMAPA) have published their 24th annual Area Involved report, detailing changes in the area of seabed licensed and dredged for marine aggregates during 2021. Key information from the report includes: A total of 21 million tonne

about 3 years ago
Making Elbe future proof by Van Oord and DEME
Technology

Making Elbe future proof by Van Oord and DEME

With vessels and carriers ever increasing in size deeper and wider access channels are needed. In Germany, Van Oord maintains the navigable depths on the River Elbe that provides access to the countries largest harbour in Hamburg. “Our diverse fleet of dredging equipment is capable to make waterways

about 3 years ago
Spotlight on Nome Harbor federal project
Technology

Spotlight on Nome Harbor federal project

Under USACE authorities, the Alaska District has deployed a team of engineers with expertise in structural, geotechnical, and hydraulics and hydrology to assess potential damage at the Nome Harbor federal project in response to Typhoon Merbok. The team will review notes and images they took of the p

about 3 years ago
TSHD Scheldt River completes first five-year docking
Technology

TSHD Scheldt River completes first five-year docking

DEME Group’s pioneering dual fuel trailing suction hopper dredger (TSHD) Scheldt River has just completed its first five-year docking. “Thanks to this wonderful DEME docking and vessel team at the BLRT Repair Yard (BLRT Grupp) in Klaipeda, it is now in top form again, ready to tackle the next assign

about 3 years ago
  • 1
  • …
  • 40
  • 41
  • 42
  • …
  • 476