Chang Shi 1 Hao detail page
Chang Shi 1 Hao
Changjiang Wuhan Waterway Engineering Company

-
Year:2007
-
Total installed power:13,585kW
-
Length hull:84m
-
Length overall:103m
-
Width:19m
-
Maximum draught:3.60m
-
Minimal dredging depth:6.50m
-
Maximal dredging depth:27m
-
Cutter power:1,280kW
-
Diameter suction pipe:800mm
-
Diameter discharge pipe:800mm