Perekopskiy detail page
Perekopskiy
Black Sea & Azov Sea Dredging
- Operator: Black Sea & Azov Sea Dredging
- Builder: Brodogradiliste Split

-
Year:1988
-
Total installed power:2,617kW
-
Length overall:80.49m
-
Width:15.10m
-
Maximum draught:4.20m
-
Maximal dredging depth:20m
-
Hopper capacity:1,300m3
-
Pump power trailing:2x 265kW
-
Diameter suction pipe(s):600mm
-
Diameter discharge pipe(s):600mm