DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›News›Ayer Developer Protects Wetlands to Settle Clean Water Violations (USA)
News

February 16, 2011 · about 15 years ago

Ayer Developer Protects Wetlands to Settle Clean Water Violations (USA)

The owner and general contractor of a residential development in Ayer, Mass., have agreed to pay a penalty of $27,500 and to donate a 7.6-acre parcel to the town to settle EPA claims that they discharged pollutants into nearby waters without the required stormwater permit and failed to apply for thi

2 minutes read
  • LinkedIn
  • X
  • Email

The owner and general contractor of a residential development in Ayer, Mass., have agreed to pay a penalty of $27,500 and to donate a 7.6-acre parcel to the town to settle EPA claims that they discharged pollutants into nearby waters without the required stormwater permit and failed to apply for this permit.

According to the agreement signed recently with EPA’s New England office, Crabtree Development will give the town 7.6 acres of the Pingry Hill development. This parcel, which is largely wetlands but also contains some upland areas, will be protected from development and used for educational purposes by the Ayer Conservation Commission.

About 31 acres have already been disturbed in developing Pingry Hill and the entire project is expected to disturb 135 acres.

EPA inspections in June 2009 found stormwater containing sand, dirt, sediment, suspended solids, residues of construction material and turbidity running off the site into nearby waters. At a follow-up inspection in December 2009, many issues had not been corrected.

Although construction began in Sept. 2007, Crabtree did not apply for the required National Pollutant Discharge Elimination System General Permit for Stormwater Discharges from Construction Site Activities until Jan. 2010.

“The wetlands being donated to the town have significant environmental value for flood control, pollutant reduction, habitat and education,” said Curt Spalding, regional administrator of EPA’s New England office. “The flood and pollutant control benefits will help offset some of the effects of the development.”

Construction activities (including other land-disturbing activities) that disturb one acre or more are regulated under the NPDES storm water program. In Massachusetts, operators of regulated construction sites are required to develop and implement Storm Water Pollution Plans (SWPPPs) and to obtain permit coverage from EPA prior to commencement of construction activity.

[mappress]

Source: epa, February 17, 2011

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

News

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1PHOTO OF THE DAY: Argentina dredges its canals before El Niño
  2. 2Høj Nordic completes Schleswig-Holstein annual dredging
  3. 3Oceanside Harbor's channel dredging about to begin
  4. 4HERBOSCH-KIERE's Atlantis wraps up work at Dumping Area 42

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free