DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›News›USA: Army Corps Seeks Public Input on Chippewa River Bank Stabilization Project
News

June 12, 2012 · about 14 years ago

USA: Army Corps Seeks Public Input on Chippewa River Bank Stabilization Project

The U.S. Army Corps of Engineers, St. Paul District, is proposing to stabilize and protect the banks along the banks of the Chippewa River Diversion approach channel. For the east bank, about 900 linear feet of the bank would be re-shaped and lined with rock. Excess material (likely soil, sand, grav

1 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers, St. Paul District, is proposing to stabilize and protect the banks along the banks of the Chippewa River Diversion approach channel.

For the east bank, about 900 linear feet of the bank would be re-shaped and lined with rock. Excess material (likely soil, sand, gravel) will be stockpiled nearby and made available to the public and other entities. For the west bank, some additional rock would be added to an area already lined with riprap.

This work would involve the operation of heavy equipment, including backhoes, trucks and dozers. The work is anticipated to require about 10 working days and would occur during the fall or winter months of 2012, depending on hydrological conditions and available funds and resources.

The Chippewa River Diversion is a gated structure controlling downstream flows for flooding purposes near the city of Watson, Minn. (Chippewa County). The approach channel has experienced substantial bank erosion caused by high flows and ice, usually during early spring. Without stabilization measures, high flows would continue to eat away at the banks, potentially leading to failure of the diversion structure.

[mappress]

Dredging Today Staff, June 13, 2012;

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

News

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1PHOTO OF THE DAY: Argentina dredges its canals before El Niño
  2. 2Høj Nordic completes Schleswig-Holstein annual dredging
  3. 3Oceanside Harbor's channel dredging about to begin
  4. 4HERBOSCH-KIERE's Atlantis wraps up work at Dumping Area 42

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free