DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›News›USA: Army Corps Continues Mississippi River Dredging
News

August 29, 2012 · about 14 years ago

USA: Army Corps Continues Mississippi River Dredging

Due to the continued extreme low water conditions, the U. S. Army Corps of Engineers’ Vicksburg District (District) and its partners are working diligently to maintain continued access to ports and navigational channels throughout the District’s area of responsibility. The historic flood of 2011disp

2 minutes read
  • LinkedIn
  • X
  • Email

Due to the continued extreme low water conditions, the U. S. Army Corps of Engineers’ Vicksburg District (District) and its partners are working diligently to maintain continued access to ports and navigational channels throughout the District’s area of responsibility.

The historic flood of 2011displaced more than average sediment deposits in the river channel and ports. The current extreme low water conditions and decreased river flow drastically affect normal sediment movement and make normal dredging extremely difficult.

The Dredge Jadwin is currently working at the Lakeport area on the Mississippi River which is approximately 5 miles south of the Highway 82 bridge near Greenville, Mississippi.

The District has contracted dredging companies to assist with the task of dredging shallow draft harbors and ports in the area. The Dredge Butcher, operated by the Pine Bluff Sand and Gravel Company, is currently at Lake Providence Harbor until late September.

The Dredge America, operated by Great Lakes Dredge and Dock Company, is currently dredging at Blue Cane on the Ouachita/Black River, with an estimated completion date of 30 August. The Dredge Integrity, operated by the Inland Dredging Company, is currently at Mile 39 of the Red River, with an estimated completion date of 3 September. The Dredge Iowa, Operated by Great Lakes Dredge and Dock Company is now under contract with the Vicksburg District and is enroute to the Greenville Harbor.

The District continues to respond to adverse low water conditions on the Mississippi River and ports by utilizing additional federal funding and adjusting the dredging schedule. If river levels continue to fall, the District may be forced to focus on maintaining access to the larger ports in the area. The maintenance of these ports is vital to ensure the transportation and delivery of commodities throughout America and abroad.

[mappress]

Press Release, August 30, 2012

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

News

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1HERBOSCH-KIERE's Atlantis wraps up work at Dumping Area 42
  2. 2Straatman: New female bow coupling for Jan de Nul
  3. 3Pilbara Ports: Eastern Harbor Revetment Project completes
  4. 4BREAKING NEWS: Boskalis and Van Oord begin IJsselmeerdijk project

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free