DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›USA: Bennington Seeks Corps Permit to Place Fill in Walloomsac River
Business & Finance

February 26, 2013 · about 13 years ago

USA: Bennington Seeks Corps Permit to Place Fill in Walloomsac River

The town of Bennington is seeking a permit from the U.S. Army Corps of Engineers, New England District to conduct work in waters of the United States in conjunction with removing a dam; protecting a water main., and stabilizing a riverbank in Bennington, Vermont. The town of Bennington proposes to p

1 minutes read
  • LinkedIn
  • X
  • Email

The town of Bennington is seeking a permit from the U.S. Army Corps of Engineers, New England District to conduct work in waters of the United States in conjunction with removing a dam; protecting a water main., and stabilizing a riverbank in Bennington, Vermont.

The town of Bennington proposes to place fill material in the Walloomsac River in conjunction with the removal of the Henry Bridge Dam, protection of an existing water main: and stabilization of the riverbank. This work is proposed in the Walloomsac River about 100 feet upstream of the Henry Bridge which connects River Road and Murphy Road on the Bennington/North Bennington town line.

The existing dam structure consists of a deteriorating timber crib spillway., two concrete abutments, and a low level outlet. Dam removal is proposed to eliminate the public safety hazard posed by the deteriorating structure and to restore this reach of the Walloomsac River to its historic free-flowing condition.

In addition, about 65 linear feet of the right bank of the river at the Henry Bridge will be reinforced with 130 cubic yards of angular rock rip rap to ensure the post-dam removal channel profile does not undermine the bridge.

The application for the federal permit was filed with the Corps in compliance with Section 404 of the Clean Water Act, which regulates the discharge or fill of material in U. S. waters, including wetlands.

[mappress]

Press Release, February 27, 2013

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1PHOTO OF THE DAY: Argentina dredges its canals before El Niño
  2. 2Høj Nordic completes Schleswig-Holstein annual dredging
  3. 3Oceanside Harbor's channel dredging about to begin
  4. 4HERBOSCH-KIERE's Atlantis wraps up work at Dumping Area 42

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free