DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Mississippi River Commission Schedules High-Water Inspection Trip (USA)
Business & Finance

April 8, 2013 · about 13 years ago

Mississippi River Commission Schedules High-Water Inspection Trip (USA)

The Mississippi River Commission will conduct its annual high-water inspection trip on the Mississippi River April 8-12, 2013. Four public meetings have been scheduled aboard the Motor Vessel MISSISSIPPI in selected towns along the river so commission members have the opportunity to meet with local

2 minutes read
  • LinkedIn
  • X
  • Email

The Mississippi River Commission will conduct its annual high-water inspection trip on the Mississippi River April 8-12, 2013.

Four public meetings have been scheduled aboard the Motor Vessel MISSISSIPPI in selected towns along the river so commission members have the opportunity to meet with local residents and hear their concerns, ideas and issues.

The agenda for each public meeting will be as follows:

1. Summary report by President of the Commission on national and regional issues affecting the U.S. Army Corps of Engineers and commission programs and projects on the Mississippi River and its tributaries.

2. District commander’s overview for the commission on current project issues in the respective District area.

3. Presentations to the Commission by local organizations and members of the public giving views or comments on any issue affecting the programs or projects of the commission and the Corps of Engineers.

General duties of the commission include recommendation of policy and work programs, the study of and reporting upon the necessity for modifications or additions to the flood control and navigation project, recommendation upon any matters authorized by law, and making semi-annual inspection trips. The duties of the commission include the entire length of the Mississippi River from its headwaters at Lake Itasca, Minn., to Head of Passes, La., where the Mississippi River empties into the Gulf of Mexico.

The purpose of the public meetings is to maintain a dialogue, an exchange of viewpoints and ideas flowing between the public and the Corps. Presentations by the public are made orally, but a copy of the remarks should be presented to the commission for the official record.

[mappress]

Press Release, April 9, 2013

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1PHOTO OF THE DAY: Argentina dredges its canals before El Niño
  2. 2Høj Nordic completes Schleswig-Holstein annual dredging
  3. 3Oceanside Harbor's channel dredging about to begin
  4. 4HERBOSCH-KIERE's Atlantis wraps up work at Dumping Area 42

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free