DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Council: Seawall Repairs for Miami (Australia)
Business & Finance

April 29, 2013 · about 13 years ago

Council: Seawall Repairs for Miami (Australia)

A 30-year-old section of the city’s boulder sea wall at Thorn Park, Marine Parade, Miami, is to be replaced over the coming months. Work has started on stage two of a project, north from Santa Monica Road, to protect a section of coastline along Marine Parade. Engineering Services Chair, Councillor

1 minutes read
  • LinkedIn
  • X
  • Email

A 30-year-old section of the city’s boulder sea wall at Thorn Park, Marine Parade, Miami, is to be replaced over the coming months.

Work has started on stage two of a project, north from Santa Monica Road, to protect a section of coastline along Marine Parade.

Engineering Services Chair, Councillor Daphne McDonald said inspections along the old wall showed it was deteriorating at this point.

“The project, estimated to cost $950,000, will replace a section of the seawall approximately 15 metres wide and five metres high, requiring extensive excavation of sand, ” she said.

“The area has been fenced and I remind residents to stay safe around the work site by observing signage and any directions issued by the contractors who will be using heavy equipment.”

The construction is an extension of works completed approximately more than a year ago.

On completion, the boulder wall, which acts as foreshore protection, limiting beach erosion, will be buried under the dune where vegetation is to be reinstated.

Council prioritises funding annually to upgrade and maintain the boulder walls along the foreshore.

[mappress]

Press Release, April 30, 2013

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1PHOTO OF THE DAY: Argentina dredges its canals before El Niño
  2. 2Høj Nordic completes Schleswig-Holstein annual dredging
  3. 3Oceanside Harbor's channel dredging about to begin
  4. 4HERBOSCH-KIERE's Atlantis wraps up work at Dumping Area 42

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free