DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Hudson Dredging: Plan for Remedial Action Work Introduced (USA)
Business & Finance

June 27, 2013 · about 13 years ago

Hudson Dredging: Plan for Remedial Action Work Introduced (USA)

The General Electric Company (GE) has announced the 2013 Remedial Action Work Plan for the Hudson River dredging program. This Remedial Action Work Plan for Phase 2 for dredging and facility operations in 2013 (2013 RAWP) constitutes GE’s RAWP for the dredging to be performed in the third year of Ph

1 minutes read
  • LinkedIn
  • X
  • Email

The General Electric Company (GE) has announced the 2013 Remedial Action Work Plan for the Hudson River dredging program.

This Remedial Action Work Plan for Phase 2 for dredging and facility operations in 2013 (2013 RAWP) constitutes GE’s RAWP for the dredging to be performed in the third year of Phase 2.

In addition, GE has submitted to EPA a Phase 2 Final Design Report for 2013, which provides GE’s design plans for the third year of Phase 2.

PROJECT SETTING

The Upper Hudson River is defined as the section of river from Fenimore Bridge in Hudson Falls to the Federal Dam at Troy, New York. The ROD calls for, among other things, a remedial action to remove and dispose of sediments containing PCBs from the Upper Hudson River.

Sediments to be removed are defined based on the PCB mass per unit area (MPA) and surface concentration criteria.

The ROD defined three sections of the Upper Hudson River for the sediment remediation activities:

• River Section 1: Former location of Fort Edward Dam to Thompson Island Dam (TID) (from river mile [RM] 194.8 to RM 188.5; approximately 6.3 river miles);

• River Section 2: TID to Northumberland Dam (from RM 188.5 to RM 183.4; approximately 5.1 RM); and

• River Section 3: Northumberland Dam to the Federal Dam at Troy (from RM 183.4 to RM 153.9; approximately 29.5 river miles).

More info

[mappress]

Press Release, June 28, 2013

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1PHOTO OF THE DAY: Argentina dredges its canals before El Niño
  2. 2Høj Nordic completes Schleswig-Holstein annual dredging
  3. 3Oceanside Harbor's channel dredging about to begin
  4. 4HERBOSCH-KIERE's Atlantis wraps up work at Dumping Area 42

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free