DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›USA: Port of Seattle Ready for Final Terminal 30 Cleanup
Business & Finance

September 25, 2013 · about 13 years ago

USA: Port of Seattle Ready for Final Terminal 30 Cleanup

A proposed amendment to a 1991 legal agreement between the Port of Seattle and the Washington Department of Ecology (Ecology) will authorize the port to propose a cleanup plan for contaminated soil and groundwater at a portion of Terminal 30 on the Seattle waterfront. Ecology seeks public comment on

1 minutes read
  • LinkedIn
  • X
  • Email

A proposed amendment to a 1991 legal agreement between the Port of Seattle and the Washington Department of Ecology (Ecology) will authorize the port to propose a cleanup plan for contaminated soil and groundwater at a portion of Terminal 30 on the Seattle waterfront.

Ecology seeks public comment on the amendment through Oct. 21. The port investigated contamination from a former fuel terminal and other past uses on the site and conducted several cleanup projects under the original 1991 order.

The cleanup plan to be completed under the amendment will be made available for public review and a future Ecology comment period. Ecology also will seek future comment on the port’s investigation and study of cleanup alternatives.

The cleanup site occupies 11 acres of the 34-acre Terminal 30 facility at 1901 E. Marginal Way S. in Seattle. Prior to its purchase by the port in 1985, the site contained a fuel terminal, a lumberyard, machine shop, and shipyard, constructed on fill material along the East Waterway of the Duwamish River. Studies have identified petroleum and related materials in soil and groundwater.

Starting in the 1980s, the port conducted several cleanup projects, called interim actions, while continuing studies needed for a draft cleanup action plan.

[mappress]

Press Release, September 26, 2013

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1PHOTO OF THE DAY: Argentina dredges its canals before El Niño
  2. 2Høj Nordic completes Schleswig-Holstein annual dredging
  3. 3Oceanside Harbor's channel dredging about to begin
  4. 4HERBOSCH-KIERE's Atlantis wraps up work at Dumping Area 42

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free