DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Pinellas County Beach Erosion Control Program Begins Soon (USA)
Business & Finance

December 10, 2013 · about 12 years ago

Pinellas County Beach Erosion Control Program Begins Soon (USA)

The U.S. Army Corps of Engineers, Jacksonville District, announced that construction operations will begin for the Pinellas County Beach Erosion Control Project in January. A portion of the work is in response to impacts from Tropical Storm Debby’s passage in 2012, and is 100% federally funded under

1 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers, Jacksonville District, announced that construction operations will begin for the Pinellas County Beach Erosion Control Project in January. A portion of the work is in response to impacts from Tropical Storm Debby’s passage in 2012, and is 100% federally funded under the Flood Control and Coastal Emergency (FCCE) program.

The Corps awarded the Pinellas County construction contract to Weeks Marine, Inc., to include renourishment of Treasure Island and Long Key beach segments. The Corps anticipates the contractor will start mobilizing equipment in early January and complete construction in early July 2014.

The beach renourishment project includes placing approximately 550,000 cubic-yards of beach quality sand along 15,000 feet of beach at an estimated cost of $16.2 million.

In total, Jacksonville District is placing 7.5 million cubic yards of sand on 38.5 miles of eroded beaches in Florida as part of the FCCE response. Beach renourishment provides significant storm damage protection for upland structures in addition to restoring shorebird and marine turtle habitat.

Due to safety concerns, some of Treasure Island and Long Key beach and access areas may be temporarily closed or restricted during construction.

[mappress]

Press Release, December 11, 2013

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1PHOTO OF THE DAY: Argentina dredges its canals before El Niño
  2. 2Høj Nordic completes Schleswig-Holstein annual dredging
  3. 3Oceanside Harbor's channel dredging about to begin
  4. 4HERBOSCH-KIERE's Atlantis wraps up work at Dumping Area 42

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free