DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Students Visit Folly Beach Shore Protection Project (USA)
Business & Finance

June 9, 2014 · about 12 years ago

Students Visit Folly Beach Shore Protection Project (USA)

The U.S. Army Corps of Engineers, Charleston District, hosted three different schools, James Island Christian School (JICS), The Porter Gaud School (PG) and Charleston Charter School of Math and Science (CCSMS) at Folly Beach to learn more about the Corps and the Folly Beach Shore Protection Project

2 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers, Charleston District, hosted three different schools, James Island Christian School (JICS), The Porter Gaud School (PG) and Charleston Charter School of Math and Science (CCSMS) at Folly Beach to learn more about the Corps and the Folly Beach Shore Protection Project.

While CCSMS visited the project in February, PG came in March and finally JICS in May, all the groups left with a better understanding of all the components that go into a shore protection project and how it reduces the risk of damage to the beach and structures along the beach from erosion.

Students were divided into two groups and rotated through three stations; the beach, turtles and Geographic Information Systems.

On the beach the students learned about constructing the project, how much sand is needed, finding the borrow area and keeping the project on schedule and within budget.

“During our experience, we learned that dredges help Folly Beach’s erosion problem and they go out in the ocean three miles and it takes about a month to get a mile down the beach,” said Juliette Lovell, a 7th grade student at Porter Gaud .

Students learned how GIS is used for shore protection projects, such as surveying the borrow areas to ensure that there is enough sand for the project. They also learned about surveying the beach to determine how much sand will be needed for renourishment and maintaining a database of the different off-shore sediment samples that have been analyzed.

[mappress]

Press Release, June 10, 2014

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & FinanceEquipmentTechnology

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1PHOTO OF THE DAY: Argentina dredges its canals before El Niño
  2. 2Høj Nordic completes Schleswig-Holstein annual dredging
  3. 3Oceanside Harbor's channel dredging about to begin
  4. 4HERBOSCH-KIERE's Atlantis wraps up work at Dumping Area 42

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free