DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Dredge Central Delivers Equipment Package
Business & Finance

June 24, 2014 · about 12 years ago

Dredge Central Delivers Equipment Package

Dredge Central, LLC has completed and delivered three 18-inch booster pump assemblies to Construcciones José, S.A. de C.V., of Mazatlan, Sinaloa. These boosters will be placed into service on a long-pipeline project in the State of Sonora, dredging 1,310,000 cubic yards (1,000,000 cu.m) of sand to a

1 minutes read
  • LinkedIn
  • X
  • Email

Dredge Central, LLC has completed and delivered three 18-inch booster pump assemblies to Construcciones José, S.A. de C.V., of Mazatlan, Sinaloa.

These boosters will be placed into service on a long-pipeline project in the State of Sonora, dredging 1,310,000 cubic yards (1,000,000 cu.m) of sand to a maximum discharge distance of approximately 23,000 ft (7,000m).

Each booster consists of an 18”x 18” Georgia Iron Works dredge pump, powered by a Caterpillar Model 3508 diesel engine, with V-belt drive. All components except for the dredge pumps (supplied with new impellers) and the diesel engines, are new.

The entire new assembly is warranted by Dredge Central, LLC for 90 days.

This contractor also elected to include a remote control package, Kruse Integration’s AUTOBOOST system, which allows the dredge operator to monitor and coordinate the boosters from a laptop computer in the dredge control room. The cost for this option also includes on-site set-up and training by Kruse’s field technical personnel.

These three large booster assemblies, complete with the remote control packages, were purchased by the contractor for less than $400,000 each.

Dredge Central also sold another large, high-powered 18-inch booster for work on another long-line project in Belize. This package will feature a 1620-hp Caterpillar 3512 engine driving through a Twin Disc marine gear.

[mappress]

Press Release, June 25, 2014

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & FinanceEquipmentTechnology

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1PHOTO OF THE DAY: Argentina dredges its canals before El Niño
  2. 2Høj Nordic completes Schleswig-Holstein annual dredging
  3. 3Oceanside Harbor's channel dredging about to begin
  4. 4HERBOSCH-KIERE's Atlantis wraps up work at Dumping Area 42

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free