DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Preparations Underway for Mt. Charleston Project (USA)
Business & Finance

August 28, 2014 · about 12 years ago

Preparations Underway for Mt. Charleston Project (USA)

The U.S. Army Corps of Engineers, Los Angeles District, has a team in place surveying the area in preparation for construction of a temporary berm and diversion channel structure along the Rainbow Subdivision in Mt. Charleston. On Feb. 27, the State of Nevada, under Public Law 84-99, requested feder

1 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers, Los Angeles District, has a team in place surveying the area in preparation for construction of a temporary berm and diversion channel structure along the Rainbow Subdivision in Mt. Charleston.

On Feb. 27, the State of Nevada, under Public Law 84-99, requested federal assistance and support. USACE headquarters approved the Advance Measures funding. Under the Advance Measures mandate, the Los Angeles District sent a team to inspect the site in March and has designed the structure for the neighborhood.

Procedural issues regarding the liability after the project would have been completed terminated the original project in June; however, with the cooperation agreement signed with the State of Nevada, the District is prepared to complete the structure.

Once the team completes its survey to see if any of the on-site features requires a change to the design due to the most recent flooding event, the District will continue through an accelerated review process and on to final plans and specs prior to construction. Construction on the berm and diversion channel should begin in early October.

This is the first time in approximately 14 years the District has received Advance Measures funding.

[mappress] Press Release, August 29, 2014

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & FinanceEquipmentTechnology

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1PHOTO OF THE DAY: Argentina dredges its canals before El Niño
  2. 2Høj Nordic completes Schleswig-Holstein annual dredging
  3. 3Oceanside Harbor's channel dredging about to begin
  4. 4HERBOSCH-KIERE's Atlantis wraps up work at Dumping Area 42

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free