DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Dredgers to Bill by Tonnage Now with REDmeters New RM2
Business & Finance

March 31, 2016 · about 10 years ago

Dredgers to Bill by Tonnage Now with REDmeters New RM2

Dredgers are now able to bill by tonnage, reduce surveying cost, and can have a project completed in less time thanks to the REDmeters new RM2 density meter. The new RM2 is a non-nuclear in-line density meter that can be mounted on any dredging vessel. The inability to bill based on tonnage creates

1 minutes read
  • LinkedIn
  • X
  • Email

Dredgers are now able to bill by tonnage, reduce surveying cost, and can have a project completed in less time thanks to the REDmeters new RM2 density meter.

The new RM2 is a non-nuclear in-line density meter that can be mounted on any dredging vessel.

The inability to bill based on tonnage creates a discrepancy in pay item between dredger and client. The red meter measures totalized mass that has moved through the pipeline.

The measured result is accurate, immediate and in real-time, not subject to the perception of bathymetric surveys.

Peter Vandenbroeck, marketing director for REDmeters , adds: “ We believe the RM2 will revolutionize the dredging industry and how it conducts contract negotiations, while grossly reducing a projects’ operational cost. Dredgers, big and small, will benefit from the RM2. ”

The real-time monitoring of the project happens on the dredging vessel, as well as on the computer network of the dredging offices. There is no limit to percent solids and thus the RM2 can handle up to 100% solid content accurately.

According to the spec sheet on the REDmeters website, the accuracy of a red meter is 99.7% and is measured over the full volume of the pipe.

The RM is traceable to NIST, ASTM and OIML standards, to ensure accurate measurement is made.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & FinanceEquipmentTechnology

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1HERBOSCH-KIERE's Atlantis wraps up work at Dumping Area 42
  2. 2Straatman: New female bow coupling for Jan de Nul
  3. 3Pilbara Ports: Eastern Harbor Revetment Project completes
  4. 4BREAKING NEWS: Boskalis and Van Oord begin IJsselmeerdijk project

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free