DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Dredge Texas Busy with the Avalon Beach Fill Project
Business & Finance

March 9, 2017 · about 9 years ago

Dredge Texas Busy with the Avalon Beach Fill Project

A periodic nourishment and repair of the dune and berm system in Avalon and Stone Harbor (NJ) is in full swing now, according to the U.S. Army Corps of Engineers, Philadelphia District. The cutterhead dredge Texas, owned and operated by Great Lakes Dredge & Dock Company, is pumping sand to the south

1 minutes read
  • LinkedIn
  • X
  • Email

A periodic nourishment and repair of the dune and berm system in Avalon and Stone Harbor (NJ) is in full swing now, according to the U.S. Army Corps of Engineers, Philadelphia District.

The cutterhead dredge Texas, owned and operated by Great Lakes Dredge & Dock Company, is pumping sand to the southern end of Stone Harbor where bulldozers are completing the nourishment and repair of the dune and berm system.

The work, designed to reduce the risk of coastal storm damages, will result in placing approx. 940,000 cubic yards of sand on the Avalon beaches.

With a daily capacity of 50,000 cubic yards of sand, it will take dredge Texas at least a month to finish the sand-pumping portion of the project.

The scheme, one of the largest in the Avalon history, will restore beaches in the Borough to their full federal template. If all goes according to schedule, work on the Avalon beach fill project is set for completion sometime in April this year.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & FinanceProject & TendersVessels

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Heartland Fabrication invests big in hopper barge production
  2. 2Weymouth hosts public meeting on Back River dredging
  3. 3Port of Seattle: Terminal 91 dredging plan on display
  4. 4Sinocalan River dredging project on the way

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free