DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Oceanside Harbor Dredging Work Set for Fall
Business & Finance

August 26, 2018 · about 8 years ago

Oceanside Harbor Dredging Work Set for Fall

The U.S. Army Corps of Engineers’ Los Angeles District said in their latest release that they plan to dredge Oceanside Harbor this fall. Manson Construction, the USACE’s contractor, will begin the work in October after environmental restrictions – which include dredging during the California least t

1 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers’ Los Angeles District said in their latest release that they plan to dredge Oceanside Harbor this fall.

Manson Construction, the USACE’s contractor, will begin the work in October after environmental restrictions – which include dredging during the California least tern nesting season – have ended.

“ The California least tern – an endangered subspecies – can be present in the area through September. Dredging, habitat loss, nesting disturbance, pollution and predation by domestic and wild animals are all threats to the species ,” USACE said.

Survey crews have been monitoring the harbor’s entrance channel on a periodic basis to ensure sufficient depth for safe navigation. Results from a July 30 survey indicated a significant amount of shoaling around the south jetty tip, and the western portion of the entrance channel was at a depth of 16 feet.

Cost of the fall dredging is about $3.5 million.

Last year, Manson Construction successfully removed 440,000 cubic yards of beach-quality sand from the harbor and placed it along Oceanside’s beaches. Typical years see an average of about 250,000 cubic yards, said USACE.

Material dredged from the entrance channels is placed along Oceanside’s beaches. Placement of beach-quality material along the shoreline is a beneficial byproduct of the maintenance dredging project.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1PHOTO OF THE DAY: Argentina dredges its canals before El Niño
  2. 2Høj Nordic completes Schleswig-Holstein annual dredging
  3. 3Oceanside Harbor's channel dredging about to begin
  4. 4HERBOSCH-KIERE's Atlantis wraps up work at Dumping Area 42

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free