DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›City of Gold Coast Unveils Protection Plan for Vulnerable Coastal Stretch
Business & Finance

August 28, 2018 · about 8 years ago

City of Gold Coast Unveils Protection Plan for Vulnerable Coastal Stretch

The City of Gold Coast said in its latest announcement that one of their most vulnerable stretches of coastline will be given significant protection. The city yesterday awarded a contract for the construction of an $18.2 million artificial offshore reef to better project Palm Beach. Palm Beach has a

2 minutes read
  • LinkedIn
  • X
  • Email

The City of Gold Coast said in its latest announcement that one of their most vulnerable stretches of coastline will be given significant protection.

The city yesterday awarded a contract for the construction of an $18.2 million artificial offshore reef to better project Palm Beach.

Palm Beach has a narrow beach width which makes it more susceptible to the effects of cyclonic swells and beach erosion compared to other coast beaches.

HC2, a joint venture between Hall Contracting Pty Ltd and Heron Construction Company, will lead the delivery of the new reef. It is phase two of the broader Palm Beach Shoreline Project which last year saw significant sand dredging occur, in preparation for the reef construction.

Mayor Tom Tate said that the city’s priority was “people and property”.

“ We want Palm Beach to be enjoyed by everyone and to achieve this, we need to invest wisely in the shoreline project ,’’ he said.

“The artificial reef is designed to control wave energy before it reaches the shore, resulting in a build-up of sand that will act as a buffer during storm season and swell events. The reef will be constructed with large boulders up to eight tonne. The boulders will be placed to form the protective reef using specialised barges and marine construction equipment.

“While the primary purpose of the artificial reef is for coastal protection, it has the potential to create a surf break under favorable swell conditions. Let’s hope the surfers get to enjoy it as well .”

Construction of the artificial reef will occur from May to October 2019.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1PHOTO OF THE DAY: Argentina dredges its canals before El Niño
  2. 2Høj Nordic completes Schleswig-Holstein annual dredging
  3. 3Oceanside Harbor's channel dredging about to begin
  4. 4HERBOSCH-KIERE's Atlantis wraps up work at Dumping Area 42

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free