DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›New Haven Harbor Feasibility Report Available for Review
Business & Finance

September 30, 2018 · about 8 years ago

New Haven Harbor Feasibility Report Available for Review

A Draft Integrated Feasibility Report and Environmental Impact Statement (D-IFR/EIS) has been prepared as part of the New Haven Harbor Navigation Improvement Project Study (NHHNIP), the U.S. Army Corps of Engineers’ New England District said in its latest post. To facilitate efficient and safe navig

1 minutes read
  • LinkedIn
  • X
  • Email

A Draft Integrated Feasibility Report and Environmental Impact Statement (D-IFR/EIS) has been prepared as part of the New Haven Harbor Navigation Improvement Project Study (NHHNIP), the U.S. Army Corps of Engineers’ New England District said in its latest post.

To facilitate efficient and safe navigation and marine commerce in New Haven Harbor in New Haven, Conn., navigation improvements (i.e., deepening and widening) to the existing Federal navigation project were studied.

The proposed project consists of deepening the main ship channel, maneuvering area, and turning basin to -40 feet MLLW and widening the main channel and turning basin to allow larger vessels to efficiently access the Port of New Haven’s terminals.

The proposed improvements would remove about 4.28 million cubic yards of predominately glacially deposited silts from the Federal channel. Additionally, approximately 43,500 cubic yards of rock would be blasted and removed from the channel.

According to USACE, several feasible alternative dredged material placement sites were identified and include:

Comments concerning the D-IFR/EIS are requested to be submitted by November 15, 2018.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1PHOTO OF THE DAY: Argentina dredges its canals before El Niño
  2. 2Høj Nordic completes Schleswig-Holstein annual dredging
  3. 3Oceanside Harbor's channel dredging about to begin
  4. 4HERBOSCH-KIERE's Atlantis wraps up work at Dumping Area 42

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free