DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Officials to Sign West Shore Lake Pontchartrain Project Agreement
Business & Finance

February 21, 2019 · about 7 years ago

Officials to Sign West Shore Lake Pontchartrain Project Agreement

Louisiana Gov. John Bel Edwards will participate tomorrow in the signing ceremony of a project partnering agreement (PPA) with the Louisiana Coastal Protection and Restoration Authority (CPRA), the Army Corps of Engineers, and the Pontchartrain Levee District (PLD) for the West Shore Lake Pontchartr

2 minutes read
  • LinkedIn
  • X
  • Email

Louisiana Gov. John Bel Edwards will participate tomorrow in the signing ceremony of a project partnering agreement (PPA) with the Louisiana Coastal Protection and Restoration Authority (CPRA), the Army Corps of Engineers, and the Pontchartrain Levee District (PLD) for the West Shore Lake Pontchartrain project.

The 2:30 p.m. event at the PLD, 2069 Railroad Avenue, Lutcher, Louisiana, will be hosted by PLD President Ricky Bosco and PLD Executive Director Monica Gorman.

Gov. Edwards will provide remarks about the significance of this structural projection project and its benefits to more than 44,000 residents and vulnerable communities in the towns of Montz, Laplace, Reserve, Lutcher, Gramercy, Grand Point, Convent, Garyville and Romeville.

Once completed, these levees and wetlands will reduce the risk of damages from tropical storm surge in the river parish region and protect communities around Lake Pontchartrain and Lake Maurepas.

Located in the Pontchartrain basin and currently in the engineering and design phase, this project will construct 18.5 miles of earthen levees and floodwalls including one mile of T-wall in St. Charles and St. John the Baptist Parishes.

Several floodgates, drainage structures and pump stations will also be constructed along the alignment from the Mississippi River in Garyville to the Bonnet Carre spillway outside of LaPlace. Additionally, non-structural protection measures will be included for communities in St. James Parish.

Federal funds in the amount of $760 million are allocated to this project through the Bipartisan Budget Act of 2018, which was signed into law Feb. 9, 2018.

For the West Shore project, project synergy will come in the form of a shared border with the River Reintroduction into Maurepas Swamp project, which will reestablish and nourish approximately 45,000 acres of the swamp with freshwater, nutrients and sediment from the Mississippi River that historically sustained the swamp. Together, these projects will provide a greater level of protection than alone.

The West Shore Project will provide structural and nonstructural features to reduce the risk of storm surges that reach the project. The Maurepas Swamp project will provide a robust and healthy swamp that will act as an added buffer to reduce the storm surges before they might reach the West Shore Project.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1PHOTO OF THE DAY: Argentina dredges its canals before El Niño
  2. 2Høj Nordic completes Schleswig-Holstein annual dredging
  3. 3Oceanside Harbor's channel dredging about to begin
  4. 4HERBOSCH-KIERE's Atlantis wraps up work at Dumping Area 42

Daily dredging and port construction news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free