DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Bay Denesse Restoration Project Underway
Business & Finance

January 27, 2020 · about 6 years ago

Bay Denesse Restoration Project Underway

Ducks Unlimited is working to restore 2,550 acres of coastal marsh approximately 2.5 miles northeast of Buras, Louisiana. The project will combine coastal restoration techniques of marsh terraces and crevasses to optimize sediment capture from the Mississippi River. Wetlands adjacent to the Mississi

1 minutes read
  • LinkedIn
  • X
  • Email
Bay Denesse Restoration Project Underway
Image source: Ducks

Ducks Unlimited is working to restore 2,550 acres of coastal marsh approximately 2.5 miles northeast of Buras, Louisiana.

The project will combine coastal restoration techniques of marsh terraces and crevasses to optimize sediment capture from the Mississippi River.

Wetlands adjacent to the Mississippi River have suffered extensive deterioration over the past century.

Historically, the Mississippi River had many distributary channels that connected nutrient and sediment rich waters of the river with marshes of the Barataria and Breton Sound Basins. The river also overtopped its banks during flood events, which helped nourish the surrounding marshes with sediment.

Due to flood control and navigation needs, federal efforts to contain the river with levees were initiated in the late 1800s and continue to this day.

The containment of the river, coupled with other sources of wetland loss (i.e., subsidence, shoreline erosion, salt water intrusion, etc.), have had detrimental impacts to the marshes flanking the river.

This project area is located south of the Mississippi River flood control levee system and is still hydrologically connected to the river. Thus, it is an ideal location to enhance river water distribution to create wetlands.

This project will restore and enhance 2,550 acres by converting open water into various habitat types, including mud/sand flats, shallow water ponds, aquatic vegetation beds, and emergent marsh.

It will also nourish existing marshes within the project area.

Reach the DredgingToday industry in one go!

DredgingToday is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow DredgingToday on:

Filed under

Business & Finance

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Jan De Nul's Galileo Galilei completes São Francisco do Sul dredging
  2. 2Crewing a dredger: Why dredge masters and TSHD engineers are the hardest seats to fill
  3. 3PHOTO OF THE DAY: Spotlight on Damen electric CSD AMORIS
  4. 4FRPD, Van Oord keep Fraser River navigable

Daily Dredging and Port Construction News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free