DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

All

Loading filters...
Operations & MaintenanceVesselsInfrastructureEquipmentTechnologyBusiness developmentResearch & DevelopmentCollaboration
Hopper dredge Magdalen begins the Duck dredging operations
Operations & Maintenance

Hopper dredge Magdalen begins the Duck dredging operations

Weeks Marine has finally begun work on the dredging and beach nourishment project in Town of Duck, North Carolina. The hopper dredge Magdalen placed the first load of sand from the subline located just south of Dianne Street on Tuesday evening (April 11). After building the construction pad, the wor

about 3 years ago
First Bipartisan Infrastructure Law project for the Walla Walla District
Operations & Maintenance

First Bipartisan Infrastructure Law project for the Walla Walla District

The Walla Walla District recently completed dredging work at the confluence of the Snake and Clearwater rivers near Lewiston, Idaho and downstream of Ice Harbor Dam. This is the first project the district has completed using Bipartisan Infrastructure Law funds. The commitment of Walla Walla District

about 3 years ago
Gloucester dredging project enters final phase
Operations & Maintenance

Gloucester dredging project enters final phase

The latest phase of dredging is taking place at Gloucester Docks, according to the The Canal & River Trust. Land & Water Group Ltd. are dredging in the basin and taking dredged material to a lagoon field near Rea Bridge where the silt will be stored temporarily before being spread at a different loc

about 3 years ago
Esplanade Lagoon maintenance includes sand replenishment
Infrastructure

Esplanade Lagoon maintenance includes sand replenishment

The Cairns Esplanade Lagoon will undergo its biennial maintenance program from 18 July to 8 August to ensure the city’s most iconic feature remains in top condition. The maintenance program will include repairs and upgrades to the pool’s surface, lighting, pump systems etc. “The pool and its surroun

about 3 years ago
Reclaiming new land at Kunburudhoo, Maldives
Infrastructure

Reclaiming new land at Kunburudhoo, Maldives

Maldives Transport and Contracting Company (MTCC) released the latest update on the Adh. Kunburudhoo Shore Protection Project yesterday. According to MTCC, the dredging and land reclamation operations are ongoing with 52% completion so far. Scope of works will include: The value of the project is MV

about 3 years ago
Eastern Shipbuilding conducts sea trials for TSHD R.B. Weeks
Equipment

Eastern Shipbuilding conducts sea trials for TSHD R.B. Weeks

Eastern Shipbuilding Group conducted sea trials for the trailing suction hopper dredger (TSHD) R.B. Weeks (ESG Hull 258) recently. “The R.B. Weeks is the second trailing suction hopper dredge we have built for Weeks Marine, Inc. This new 356-foot vessel has a hopper capacity of 8,550 cubic yards,” T

about 3 years ago
Eagle Dynamic Solutions opts for Mud Cat again
Equipment

Eagle Dynamic Solutions opts for Mud Cat again

Eagle Dynamic Solutions of Evans, Georgia, recently took delivery of their second Mud Cat® 115D after their first Mud Cat 115D was a complete success for their dredging operations. In addition to the purchase of another Mud Cat 115D, Eagle also purchased a patented WeedMaster® Cutterhead for convert

about 3 years ago
Another successful job for Bell Amphibious Excavator
Equipment

Another successful job for Bell Amphibious Excavator

Bell Amphibious Excavator once again proved to be the right choice for dredging operations in challenging terrains that are not accessible by traditional dredgers. Through their French dealer PAJOT Solutions de battage, Bell recently provided a 20-ton Bell Amphibious Excavator to enlarge and deepen

about 3 years ago
Applying early contractor involvement in marine infrastructure procurement
Business development

Applying early contractor involvement in marine infrastructure procurement

Complex construction projects that use traditional procurement practices are often impacted by significant cost overruns and delays. Early contractor involvement (ECI) is a concept that strives to involve the contractor collaboratively at an early stage of a project’s development to mitigate or othe

about 3 years ago
EXCLUSIVE: Top dredging players in race for NEOM Duba Port contract
Business development

EXCLUSIVE: Top dredging players in race for NEOM Duba Port contract

NEOM has invited selected companies to bid for a contract to complete the next phase of the Duba Port Expansion at Oxagon Industrial City. According to MEED, the companies need to submit their offers before May 11. The prospective bidders are: The contract to execute the first phase of the Duba Port

about 3 years ago
Harwich Haven Authority launches new dredging technology Tiamat
Equipment

Harwich Haven Authority launches new dredging technology Tiamat

Following robust development and trials, Harwich Haven Authority (HHA) is bringing Tiamat, a new and innovative agitation dredging solution. The commercialisation of this industry technology will be through a newly incorporated, and wholly owned subsidiary of the Authority, Haven Dredging Ltd. As a

about 3 years ago
Alewijnse completes another high-quality TSHD project
Collaboration

Alewijnse completes another high-quality TSHD project

Alewijnse team recently completed another successful project for Royal IHC, underlining its firm relationship with the Dutch shipbuilder. The project included design and engineering of the electrical installation aboard the hopper dredger TEUNIS HUIBERTUS. According to Alewijnse, the project was don

about 3 years ago
Mike Hooks CSD E. Stroud busy in Pascagoula
Equipment

Mike Hooks CSD E. Stroud busy in Pascagoula

Dredging work is moving ahead on the Pascagoula River in Pascagoula, Miss., and the U.S. Coast Guard is urging mariners in the area to exercise caution. The Mike Hooks cutter suction dredger (CSD) E. Stroud is currently conducting dredging operations for the U.S. Army Corps of Engineers just north o

about 3 years ago
Another round of Salem River dredging
Operations & Maintenance

Another round of Salem River dredging

The U.S. Army Corps of Engineers is about to embark on another round of maintenance dredging of Salem River Federal Navigation Channel. The Corps recently proposed to hydraulically dredge approximately 209,000 cubic yards of material from the Salem River FNC in the vicinity of Salem Cove in New Cast

about 3 years ago
  • 1
  • …
  • 380
  • 381
  • 382
  • …
  • 3354