
The Army Corps’ Jacksonville District is opening public comment on the Draft Environmental Assessment (EA) and proposed Finding of No Significant Impact (FONSI) for the operation and maintenance dredging of the Okeechobee Waterway (OWW). “Maintaining safe navigation on federal waterways is one of th

Lt. Gen. Todd T. Semonite, Chief of Engineers, has signed a Chief’s Report recommending to Congress a Coastal Storm Risk Management Project for Tidal sections of the Rahway River— representing completion of a key milestone, reports the Army Corps, New York District. The Chief’s Report will now under

Today, crews at Starved Rock Lock and Dam in Ottawa, Illinois, began dredging the lock chamber in preparation for the closure as part of the 2020 Illinois Waterway Consolidated Closures. According to the Army Corps Rock Island District, they are cleaning excess silt, sand and debris from the chamber

The U.S. Army Corps of Engineers is seeking public comment on its draft feasibility report and Environmental Assessment on making modifications to Brunswick harbor to increase transportation efficiencies and reduce costs. “This deep draft navigation feasibility study will analyze alternatives for na

Work is now under way on the fourth year of a five-year project to raise the banks of the Ouse Washes flood storage reservoir, informs the Environment Agency. Works on the Ouse Washes project started in 2017 at Welmore Lake Sluice and Sutton Gault. This summer’s works will take place at Welney and i

The Oregon Department of Environmental Quality (DEQ) has received application for 401 Water Quality Certification for dredging in Lower Columbia River. As DEQ reported, J.E. McAmis, Inc. has applied for a U.S. Army Corps of Engineers 404 Permit for dredging activities in the lower Columbia River. Th

Lt. Gen. Todd T. Semonite, commanding general of the Army Corps and 54th U.S. Army Chief of Engineers, has approved the recommended plan for navigation improvements at the Port of Nome, Alaska. With the completion of the Chief’s Report for the Port of Nome Modification Feasibility Study, the proposa

There are officially three weeks left to provide input on the draft report for the Charleston Peninsula Flood Risk Management Study. The $3 million Charleston Peninsula study investigates solutions to address coastal storm risk to people, property and infrastructure on the peninsula. It was jointly