
Knoop BV said that their latest dredging project in Tynaarlo, a municipality in the Northeastern Netherlands, is in full swing. “Our Waterking WK 350, equipped with a Damen DOP 200 dredge pump, is now fully operational on site. The pipeline system is in place, gravel is being pumped ashore, and the

This summer, the Tiel-Waardenburg dyke reinforcement project achieved an impressive milestone: more than 100,000 operating hours with electric equipment. From trucks and cranes to shovels and sheet piles, an average of 45 electric machines are operating on the construction site daily. This has alrea