DredgingToday
  • Capital Dredging
  • Maintenance Dredging
  • Land Reclamation
  • Port Expansion
  • Coastal Protection
  • More News
JobsNewsletter
DredgingToday logo

Your trusted source for global dredging news, part of the Navingo network.

Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Wind
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report Your News
  • Privacy Policy

© 2026 Navingo. All rights reserved.

Operations & Maintenance

Dredging the Murghab River
Operations & Maintenance

Dredging the Murghab River

The Murghab River, a transboundary river that flows from Afghanistan to Turkmenistan, hasn’t been dredged in a long time. According to the USAID Central Asia, over the past three decades, the riverbed has risen by nearly three meters. Additionally, the risk of flooding increased with changes in rive

about 5 years ago
Replacing the pump casing of DOP dredge pump (VIDEO)
Operations & Maintenance

Replacing the pump casing of DOP dredge pump (VIDEO)

Damen recently released a new tutorial online: how to replace the pump casing of a DOP submersible dredge pump. Dredging equipment is always subject to wear – as is this submersible slurry pump. By pumping sand and gravel continuously wear parts – pump casing, impeller, wear plates – are in contact

about 5 years ago
The Strand works starting next week
Operations & Maintenance

The Strand works starting next week

The City of Townsville, Queensland, has just announced that a beach restoration project will kick off next week on The Strand. According to the release, officials will use more than 2,500m³ of sand to restore the beach. The foreshore between Longboard and the Sailing Club is to close from 12 October

about 5 years ago
Cashman begins Wellfleet Harbor dredging project
Operations & Maintenance

Cashman begins Wellfleet Harbor dredging project

The long-awaited Wellfleet Harbor Dredging Project in Massachusetts is now underway, according to the town officials. As reported, the dredging of the federal channel started on October 1, 2020. The works will continue through the allowable dredging seasons, October 1 through December 31, of 2020, 2

about 5 years ago
Vilano Beach renourishment project on the way
Operations & Maintenance

Vilano Beach renourishment project on the way

Great Lakes Dredge & Dock Company, LLC is ready to begin restoration of the critically eroded shoreline along the coast of St. Johns County, Florida. The project will include both dune and beach berm construction along approximately 2.6 miles of coastline from Vilano Beach to South Ponte Vedra Beach

about 5 years ago
Land & Water completes dredging works at Thurrock
Operations & Maintenance

Land & Water completes dredging works at Thurrock

Land & Water Group has just announced the successful completion of the Thurrock dredging project on the River Thames. The main goal of the scheme was to remove contaminated materials from the berth of the marine terminal. For the project, the Land & Water team used their largest long reach excavator

about 5 years ago
TSHD Albatros ready for Lyttelton dredging campaign
Operations & Maintenance

TSHD Albatros ready for Lyttelton dredging campaign

Trailer suction hopper dredge Albatros is about to begin annual maintenance dredging campaign in Lyttelton, New Zealand. Starting this week, visitors may spot the Dutch-owned Albatros working around Lyttelton Harbour. These works are part of an 11-week maintenance dredging campaign, said Lyttelton P

about 5 years ago
Rohde Nielsen wraps up work on the Tolmount project
Operations & Maintenance

Rohde Nielsen wraps up work on the Tolmount project

Rohde Nielsen A/S recently completed the route preparation works on the Tolmount Development Project for Saipem LTD. During the works, which started in early spring, the company cleared over 3.000 boulders from the pipeline route. Rohde Nielsen also dredged and backfilled a 5km nearshore trench and

about 5 years ago
Buffalo Harbor dredging campaign underway
Operations & Maintenance

Buffalo Harbor dredging campaign underway

The U.S. Army Corps of Engineers, Buffalo District recently began operations and maintenance (O&M) dredging of the Buffalo Harbor. The work includes standard O&M dredging of 114,000 cubic yards, as well as 120,000 CY of strategic navigation dredging funded by the Great Lakes Restoration Initiative.

about 6 years ago
Orion Group wins Galveston Harbor dredging contract
Operations & Maintenance

Orion Group wins Galveston Harbor dredging contract

Orion Group Holdings, Inc. (ORN) late yesterday announced a contract award of approximately $16 million for a dredging project in Texas. According to the release, ORN’s Marine segment won a contract from USACE to provide dredging services in Galveston, Texas. “This award adds further visibility into

about 6 years ago
Luedtke to dredge Green Bay Harbor, WI
Operations & Maintenance

Luedtke to dredge Green Bay Harbor, WI

Luedtke Engineering Company has returned to Green Bay Harbor for the fourth time in the last five years to complete maintenance dredging of the federal navigational channel, informs the Wisconsin Domestic Maritime Coalition. Each year clean dredge material is beneficially reused and pumped into isla

about 6 years ago
Dredging works progressing well at Fountain Lake
Operations & Maintenance

Dredging works progressing well at Fountain Lake

J.F. Brennan Company, Inc. is working in full swing to complete the Fountain Lake restoration project. According to Shell Rock River Watershed District (SRRWD), the past week was another productive one for crews working on this dredging program. The dredging operations are part of the overall phase

about 6 years ago
Rohde Nielsen completes major beachfill in Sylt, Germany
Operations & Maintenance

Rohde Nielsen completes major beachfill in Sylt, Germany

Rohde Nielsen A/S yesterday announced the successful completion of the 4-year contract “Beach Nourishment Sylt 2017 – 2020”. According to the company, the project was completed six weeks ahead of schedule. Sylt is a sandy barrier island in the North Sea. It is the most northern of the German Wadden

about 6 years ago
GLDD completes Ocean City beachfill
Operations & Maintenance

GLDD completes Ocean City beachfill

Great Lakes Dredge and Dock Company recently completed the north end beach replenishment project in Ocean City, NJ. Under the scheme, GLDD restored beaches between the terminal groin at Seaview Road and 13th Street. For the works, the contractor used a dredge placed just off the Great Egg Harbor Inl

about 6 years ago
  • 1
  • …
  • 59
  • 60
  • 61
  • 62