Guang Zhou Hao detail page
Guang Zhou Hao
CCCC Guangzhou Dredging Co. Ltd.
- Operator: CCCC Guangzhou Dredging Co. Ltd.
- Builder: Royal IHC

-
Year:1994
-
Total installed power:8,800kW
-
Length hull:115m
-
Length overall:121.19m
-
Width:21m
-
Maximum draught:7.80m
-
Minimal dredging depth:30m
-
Maximal dredging depth:45m
-
Hopper capacity:5,250m3
-
Diameter suction pipe(s):2x 900mm