Mouse River Plans on Display

The U.S. Army Corps of Engineers, St. Paul District, is inviting comments on an addendum to the draft Environmental ...

read more →

Mouse River Plan on Display

The City of Minot will next week host a public meeting on the Mouse River Enhanced Flood Protection Project draft ...

read more →

Phase BU-1 Gets OK

The Souris River Joint Board has approved a contract to begin the full design of the Burlington Levee Project ...

read more →

Mouse River Study on the Way

The U.S. Army Corps of Engineers released its 2016 Work Plan yesterday, which includes $200,000 in funding for ...

read more →

Senator Pushes for Minot Flood Project

Senator John Hoeven met last week with Lt. Gen. Thomas Bostick, Commanding General of the U.S. Army Corps of ...

read more →

Comments Invited on Mouse River Scheme

The U.S. Army Corps of Engineers, St. Paul District, and the Souris River Joint Water Resources Board, or SRJB, are ...

read more →

USACE to Hold Meetings on Mouse River Project

The U.S. Army Corps of Engineers, St. Paul District, and the Souris River Joint Water Resources Board, or SRJB, ...

read more →