Bonny River detail page
-
Year:2017
-
Design:C-Job Naval Architects
-
Total installed power:17,600kW
-
Length overall:158.20m
-
Maximum draught:9.80m
-
Minimal dredging depth:30m
-
Maximal dredging depth:100m
-
Hopper capacity:16,352m3
-
Diameter suction pipe(s):1,200mm