USACE Proposes Maintenance Dredging on Mississippi River (USA)

The maintenace dredging work consists of furnishing one hydraulic pipeline dredge and attendant plant necessary for the removal and satisfactory disposal of shoal material from the lower Mississippi River and Southwest Pass within the limits of work.

The estimated time of completion is 135 calendar days.

Estimated price range is between $5 million and $10 million.

[mappress]

Source: fbo.gov, July 1, 2010