Maintenance dredging underway at Port Walcott

The Department of Transport, Western Australia, has announced that maintenance dredging works are underway at the Port Walcott.

Photo courtesy of JDN

This dredging campaign commenced in mid-January 2024 and is expected to be completed by approximately the 9 February 2024.

According to DoT, dredging is being undertaken in the Rio Tinto Iron Ore berth pockets, turning basins and navigation channels, with material placed offshore in 3 offshore spoil grounds.

Jan de Nul’s trailing suction hopper dredge (TSHD) Juan Sebastian de Elcano “Elcano” (LOA: 158m) is the primary dredge vessel undertaking the works.