CCCC Bags Phase 2 of Caofeidian Project

CCCC First Harbor Engineering Co., Ltd. has won bid for the Phase 2 of the Legend Holdings engineering terminal project in Hebei Province, China.

The contract, valued at 370 million yuan and with a construction period of 420 days, is for construction of universal break-bulk cargo berths in Caofeidian area of Tangshan Port.

Located on the west coastline of Caofeidian port area and connected to the completed Phase 1, the project involves 450,000 t break-bulk cargo berths with a designed annual through capacity of 6 million tons, with the designed water depth of the terminal of 13.5 meters.

As a strategic channel for west-east coal transfer and north-south coal transport, after its completion, the project will effectively improve the port’s capacity for energy output, and be of great significance to improving the local investment environment and advancing the balance of strategic resources between regions.

Press Release

Share this article

Follow Dredging Today

Events>

<< Apr 2020 >>
MTWTFSS
30 31 1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 1 2 3

Navingo Career Event 2020

The Navingo Career Event is Europe’s biggest career event for the maritime,…

read more >

Jobs>

Looking to fill a job opening?

By advertising your job here, on the homepage of DredgingToday.com, you'll reach countless professionals in the sector. For more information, click below....

apply

Dredging jobs in Abu Dhabi at NMDC

National Marine Dredging Company “NMDC” aims to be the largest dredging player in the Arab’s Gulf region...

apply

Looking to fill a job opening?

By advertising your job here, on the homepage of DredgingToday.com, you'll reach countless professionals in the sector. For more information, click below...

apply