Ibiza Port Project Kicks Off

In order to improve cruises’ traffic capacity and docking manoeuvre in Ibiza port, south pier extension works started this week at Botafoc docks.

Adopted solution has been the construction of three dolphin docks that will allow extending docking length until 328 and 375, in both sides of the jetty thus allowing two vessels up to 335 meters in length in one side and 290 meters in length in the other side to dock simultaneously.

The project also includes building a dolphin dock and two double reinforced concrete docks really much bigger, supported on 2 meters in diameter piles.

This structural design will let the optimization of the quantities of steel and cast concrete to be used and will also redound in an optimization of the cost and execution time.

From sustainable environment point of view, it is a fitting solution because facilitate water port renovation.

Share this article

Follow Dredging Today

Events>

<< Apr 2020 >>
MTWTFSS
30 31 1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 1 2 3

Navingo Career Event 2020

The Navingo Career Event is Europe’s biggest career event for the maritime,…

read more >

Jobs>

Looking to fill a job opening?

By advertising your job here, on the homepage of DredgingToday.com, you'll reach countless professionals in the sector. For more information, click below....

apply

Dredging jobs in Abu Dhabi at NMDC

National Marine Dredging Company “NMDC” aims to be the largest dredging player in the Arab’s Gulf region...

apply

Looking to fill a job opening?

By advertising your job here, on the homepage of DredgingToday.com, you'll reach countless professionals in the sector. For more information, click below...

apply