Port of Blyth Maintenance Dredging Campaign Begins

Image source: UKD

A Port of Blyth maintenance dredging campaign is set to begin today and will last for a period of two days, the port said in their latest release. 

According to the official announcement, this dredging program will be conducted at the port approaches, main navigational channel and operational commercial berths.

The Port of Blyth cleanup scheme will include frequent trips to and from the spoil deposit ground approximately 3 miles ENE of the harbor East Pier and south bound past the wind turbine array.

Under the maintenance dredging plan, the operations are going to be conducted over a 24 hour period by the trailing suction hopper dredger UKD Orca and the tug/plough dredging vessel Blyth Endeavour.

According to UK Dredging (UKD), the vessel’s owner, the TSHD UKD Orca is equipped with twin suction pipes fitted well aft and is capable of dredging in confined spaces making her ideal for maintenance dredging.

Share this article

Follow Dredging Today

Events>

<< Apr 2020 >>
MTWTFSS
30 31 1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 1 2 3

Navingo Career Event 2020

The Navingo Career Event is Europe’s biggest career event for the maritime,…

read more >

Jobs>

Looking to fill a job opening?

By advertising your job here, on the homepage of DredgingToday.com, you'll reach countless professionals in the sector. For more information, click below...

apply

Looking to fill a job opening?

By advertising your job here, on the homepage of DredgingToday.com, you'll reach countless professionals in the sector. For more information, click below....

apply

Dredging jobs in Abu Dhabi at NMDC

National Marine Dredging Company “NMDC” aims to be the largest dredging player in the Arab’s Gulf region...

apply