Herrington Harbour has just released this amazing video named ‘Dredging Day at Herrington Harbour South’.
Places in the Entrance Channel at Herrington Harbour South are being mechanically dredged this winter.
Mechanical dredging is done by digging with excavators and moving the material by barge where it’s loaded into trucks.
In and out of the marina, the passage for boaters to the beautiful Chesapeake Bay is maintained at a minimum of 7’MLW.
Located on the Chesapeake Bay in Maryland, their Marina Resort has 600 boat slips, lodging, dining, and wedding venues.
Photo: HerringtonHarbour
List of related news articles
-
Posted: about 1 month ago
Major milestone for the Esquimalt Harbour project
After months of hard work, the $162.5 million-Esquimalt Harbour Remediation Project has reached a ma...
Posted: about 1 month ago -
Posted: 29 days ago
Great South Bay dredging plan unveiled
Pier 10 Yacht Club has requested Department of the Army authorization for dredging with 10-years mai...
Posted: 29 days ago -
Posted: 7 days ago
Separating sand from mud USACE VIDEO
The U.S. Army Corps of Engineers and its Engineer Research and Development Center are currently cond...
Posted: 7 days ago -
Posted: about 1 month ago
CEDA Dredging Days 2021 set for Fall
CEDA Dredging Days 2021, the flagship conference of the Central Dredging Association (CEDA), will ta...
Posted: about 1 month ago