CCCC First Harbor Wins Dachanwan Port Zone Reclamation Project (China)

CCCC First Harbor Engineering Co., Ltd. has recently won the bid for the soft foundation treatment of the reclamation area of Dachanwan port zone in Shenzhen, with a construction period of 1,461 days.

Located in the east of Phase 1 terminal of Dachanwan port zone in Xixiang Town, Baoan District, Shenzhen, with a foundation treatment area of some 1.08 million square meters, the project uses the technology of direct-discharge vacuum preloading and sand-gravel piles, and involves works such as site leveling, bamboo board laying, non-woven laying, sand mat backfill, plastic drainage board driving and site leveling of sand-gravel piles.

After its completion, the project will improve the bearing capacity of the foundation of Dachanwan port zone in Shenzhen and play a significant role in promoting regional economic development.

Press Release, April 14, 2014

Share this article

Follow Dredging Today

Events>

<< May 2020 >>
MTWTFSS
27 28 29 30 1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31

Navingo Career Event 2020

The Navingo Career Event is Europe’s biggest career event for the maritime,…

read more >

Jobs>

Looking to fill a job opening?

By advertising your job here, on the homepage of DredgingToday.com, you'll reach countless professionals in the sector. For more information, click below....

apply

Looking to fill a job opening?

By advertising your job here, on the homepage of DredgingToday.com, you'll reach countless professionals in the sector. For more information, click below...

apply

Dredging jobs in Abu Dhabi at NMDC

National Marine Dredging Company “NMDC” aims to be the largest dredging player in the Arab’s Gulf region...

apply