Krasnoye Sormovo Ready to Launch Rosmorport’s New TSHD

Krasnoye Sormovo shipyard – part of United Shipbuilding Corporation – has just announced that the launching ceremony for the 1000 m³ trailing suction hopper dredger ‘Sommers’ will be held on January 29th 2016.

The dredger comes as the first in a series of three TSHD 1000 vessels that the shipyard is building for FSUE “Rosmorport”.

The newbuilds, to be equipped with the necessary high-dredging equipment, suitable for the climatic conditions of the region, will be stationed at seaports of Ust-Luga, Big Port St. Petersburg and Port of Tuapse.

All three vessels will have an outboard multifunctional submersible groundwater pump type “DOP 200”.

The main dimensions of the vessels:

  • Maximum length – 62.6m;
  • Length between perpendiculars – 58.4m;
  • Beam – 14.0m;
  • Draft loaded – 4.25m;
  • Maximum depth of dredging – 20m;
  • Volume of holds – 1000m³.

Delivery of the three THSDs, (Sommers, Kronshlot and Kadosh) has been set for 2016 and 2017, respectively.

 

Share this article

Follow Dredging Today

Events>

<< Apr 2020 >>
MTWTFSS
30 31 1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 1 2 3

Navingo Career Event 2020

The Navingo Career Event is Europe’s biggest career event for the maritime,…

read more >

Jobs>

Looking to fill a job opening?

By advertising your job here, on the homepage of DredgingToday.com, you'll reach countless professionals in the sector. For more information, click below...

apply

Looking to fill a job opening?

By advertising your job here, on the homepage of DredgingToday.com, you'll reach countless professionals in the sector. For more information, click below....

apply

Dredging jobs in Abu Dhabi at NMDC

National Marine Dredging Company “NMDC” aims to be the largest dredging player in the Arab’s Gulf region...

apply