Teledyne Introduces MB2 Multibeam Echosounder
Teledyne Odom Hydrographic, a provider of hydrographic sonar solutions, has launched the MB2 Multibeam Echosounder.
MB2 is developed for fast mobilization on smaller vessels and is optimized for shallow water survey companies, port and harbor authorities, dredging companies and other users.
As an option, MB2 can be supplied with an Integrated GNSS aided INS powered by Applanix’ POS MV WaveMaster engine, as well as an integrated real-time SVP sensor to simplify installation and calibration, making the MB2 perfect for use on vessels of opportunity, small survey launches and ASVs.
MB2 features a dedicated cylindrical transmit array and broad range of sounding frequencies from 200–460 KHz improving on the performance of the MB1 by offering a wider coverage and narrower acoustic beam. Using both amplitude and phase bottom detection, the MB2 is capable of sounding a swath of up to 140° in up to 110m of water depth.
“The new MB2 is the outcome of a dedicated product development effort over the last three years, building on customer feedback and experiences gathered in the market for ultra-compact Echosounders for fast mobilization. Our product range of MB1 and MB2 will now fit a much broader span of both budget and performance expectations,” said Stephen F. Apsey, General Manager for Teledyne Odom Hydrographic.
With 24 bit raw data, both water column and seabed information can be collected within the controller software. The Real Time Appliance (RTA) synchronizes all of the sensors with accuracy better than 0.1 ms.
List of related news articles
-
Posted: 9 months ago
New Survey Vessel by Teledyne
Teledyne Marine has released a new unmanned survey vessel – the TELEDYNE Z-BOATTM 1800-T. The survey...
Posted: 9 months ago -
Posted: 6 months ago
DSC Dredge, Teledyne, Trimble introduce DSC Vision
DSC Dredge, LLC, has joined forces with Teledyne Marine and Trimble to create DSC VISION – a h...
Posted: 6 months ago -
Posted: 2 months ago
Dragflow DRP Series busy in Germany
A sediment removal scheme on the Wehra reservoir, located deep in the German Black Forest, is curren...
Posted: 2 months ago -
Posted: 14 days ago
Field studies continue for Roberts Bank Terminal 2 Project
The Vancouver Fraser Port Authority is continuing field studies in January 2021 as part of ongoing e...
Posted: 14 days ago