Haslar Marina Maintenance Dredging About to Begin

Image source: Jenkins Marine

Jenkins Marine Ltd is about to begin a routine maintenance dredging project within Haslar Marina Gosport and the RNSA pontoon, informs the Queen’s Harbor Master Portsmouth.

According to the notice, the maintenance dredging will begin within Haslar Marina Gosport and the RNSA pontoon (located to the south of the marina), from 9 September 2019 with completion expected by mid December 2019.

For the project, the contractor will bring in the 30.1m backhoe dredger ‘DOREEN DORWARD’.

The dredged material will be loaded into one of two 44.1m self propelled split hopper barges ‘NAB’ or ‘NEEDLES’ for disposal to the Nab spoil Ground.

Operations will be conducted daily between 0600 and 2100 Monday to Friday but with the option to work weekends if bad weather is a factor, reported the Harbor Master.

They also added that the RNSA pontoon will have to be removed to facilitate these works and will be renewed and re-piled by Walcon Marine Ltd, assisted by marine assets belonging to Baker Trayte Marine Ltd.

 

Share this article

Follow Dredging Today

Events>

<< Apr 2020 >>
MTWTFSS
30 31 1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 1 2 3

Navingo Career Event 2020

The Navingo Career Event is Europe’s biggest career event for the maritime,…

read more >

Jobs>

Looking to fill a job opening?

By advertising your job here, on the homepage of DredgingToday.com, you'll reach countless professionals in the sector. For more information, click below...

apply

Dredging jobs in Abu Dhabi at NMDC

National Marine Dredging Company “NMDC” aims to be the largest dredging player in the Arab’s Gulf region...

apply

Looking to fill a job opening?

By advertising your job here, on the homepage of DredgingToday.com, you'll reach countless professionals in the sector. For more information, click below....

apply